Similar Projects
Berwick Area YMCA
New Construction - 8,000 SF
Conception
$3,300,000 est. value
Berwick, PA 18603

Lancaster Host Resort - Expo Center Parking
New Construction
Design
Lancaster, PA 17602

Hopewell Township Park Walking Trail and Old Firehouse Parking Lots
Post-Bid
Newburg, PA 17240

Scott Park ADA Ramps and Sidewalk Improvements
Post-Bid
$38,390 est. value
Carnegie, PA 15106

Parking Lot Construction for Administration Building
Results
Latrobe, PA

Logan Avenue Streetscape
Results
Tyrone, PA 16686

Eagle Village Parking Expansion
Addition
Construction
$100,000 est. value
Chester Springs, PA 19425

Greentree Industrial Park - Truck Parking
New Construction
Construction
Alburtis, PA 18011

Civic Center ADA Upgrades
Post-Bid
$46,425 est. value
Pittsburgh, PA 15227

Concrete Sidewalk Repair
Results
$25,000 to $100,000 est. value
Johnstown, PA

Handicapped Parking and Infield Access Tunnel
Construction
Port Royal, PA 17082

ADA Improvement
Post-Bid
New Castle, PA

Vanadium Road Sidewalk Improvements
Results
PA

Fawn Lake Parking Lot Project
Construction
PA

Francis Avenue Tree Removal and Sidewalk Installation Project
Post-Bid
Connellsville, PA 15425

Last Updated 11/13/2019 11:38 AM
Project Title

CDBG Curb Cut Reconstruction Project - 2018 Pine Street (Parts I and II) and Chestnut Street (Parts III and IV)

Physical Address View project details and contacts
City, State (County) Berwick, PA   (Columbia County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of curb cuts, ramps and landings hereunder are located on Part I - Pine Street from East Wyandotte Avenue to East Eighth Street, Part II - Pine Street from East Ninth Street to East Twelfth Street; Part III - Chestnut Street from East Third Street to East Fifth Street; Part IV - Chestnut Street from East 5th and a half Street to East Tenth Street. The Work comprises the removal of existing curbs and sidewalks and the installation of curb cuts, ramps and landings in accordance with the PennDOT RC-67M Standards, including 1' existing pavement cutback, excavation/backfill, sawcut, rebar, subbase, detectable warning surface, expansion joint material, joint sealer, lawn restoration, temporary/permanent pavement restoration, concrete testing, workmanship and all appurtenances

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents