Similar Projects
Tomah - Mauston, STH 82 Interch Prep / X-Overs / Temp Road
Results
Mauston, Tomah, WI 53948

Mauston - IH 39, STH 13 - CTH B
Results
Mauston, WI

Local Road Improvements
Renovation
Post-Bid
Lyndon Station, WI

Sealcoating and Crack Filling
Bidding
WI

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

Statewide Pavement Maintenance 2021-2022
Term Contract
Bidding
Less than $5,000 est. value

Mauston - Necedah, Colfax Street to STH
Results
Mauston, Necedah, WI 53948

2021 Ensch Street Reconstruction
Results
$1,334,577 est. value
Mauston, WI 53948

2021 West Bridge Street Reconstruction
Post-Bid
New Lisbon, WI 53950

2021 Tennis Courts
Post-Bid
Mauston, WI 53948

2021 Street Repair and Maintenance
Bidding
Mauston, WI

6th Avenue and 28th Street Pulverizing & Relay, Limestone Base Replacement
Post-Bid
$64,000 est. value
Camp Douglas, WI 54618

Wisconsin Street Reconditioning
Results
New Lisbon, WI 53950

Tunnel Hill Road TRIP
Bidding
Camp Douglas, WI

Last Updated 01/15/2021 04:49 PM
Project Title

Paving Work

Physical Address View project details and contacts
City, State (County) Lyndon Station, WI   (Juneau County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Coon Bluff Rd - Dellwood to Briar Bluff - Crack-fill and 2" asphalt sealcoat Oak Hill Rd - Lyndon Rd to Sommers Farm - Grind and 2" asphalt pavement (With expanded pavement width through the curve east of Lyndon Rd) Oak Hill Rd - Coon Bluff to Lyndon Rd - Grind and 2" asphalt pavement Lyndon Rd - From Hwy H approx. 1/2 north - Grind and 2.5 "asphalt pavement. All projects shall be completed by June 30, 2021. A $300 per day penalty may be applied for each day late if completion goes beyond the specified completion date.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents