Similar Projects
Wells Street Parking Facility LED Lighting Upgrade
Alteration
Bidding
Keene, NH 03431

Group Net Metering Photovoltaic System
Alteration
Bidding
Derry, NH

Municipal Solar Project - Landfill Site
Post-Bid
Jaffrey, NH

Solar Photovoltaic Roof-Mounted System
Post-Bid
Wolfeboro, NH

J--Electrical Services BOA SB SA
Results
Manchester, NH 03104

Echo Lake New Park Store Deck and Electrical
Results
North Conway, NH 03860

Design/Build Services - High Voltage Transformers Replacements
Post-Bid
Concord, NH

Electrical Installation and Modification Services
Results
$2,500 to $490,927 est. value
Hanover, NH

Energy Performance Contracting Services
Post-Bid
Concord, NH 03301

Generators at Derry Village BLS1 BLS 2
Results
Derry, NH

Energy Performance Contract
Post-Bid
Somersworth, NH

Generator - Supply and Install
Results
Concord, NH

Electrical Vehicle Charging Station
Post-Bid
Peterborough, NH

Electrical Support
Results
Hooksett, NH

Cleveland/Rudman Lighting Control Systems Replacement
Post-Bid
$250,000 to $500,000 est. value
Concord, NH

Reported 07/31/2021 12:00 AM
Project Title

Generator Replacement, Surry Mountain Dam, Surry, NH

Physical Address View project details and contacts
City, State (County) Surry, NH 03431   (Cheshire County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $100,000 to $250,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The generator replacement project will require the Contractor to remove the existing diesel generator inside of the Surry Mountain gatehouse and replace with a new diesel generator to be located closer to the project office on Surry Dam Road. In addition to replacing the generator, the Contractor shall relocate the conductors that currently travel overhead to the spillway bridge to an underground conduit (approximately 500’). Once the existing conductors reach the spillway bridge, they enter conduit installed below the bridge deck and then continue to the gatehouse on the other side in buried conduit. The design intent is to reuse the existing conduits below the bridge along with the underground conduit that goes into the gatehouse. In the event the Government determines that the existing conduit is not suitable for reuse, the project would also include the replacement of the conduit below the bridge and the underground conduit that connects to the gatehouse. For reference, the spillway bridge is approximately 15 feet wide and 230 feet long and crosses over the Surry Mountain Dam spillway located on Surry Dam Rd

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents