Similar Projects
Billy Bowlegs Recreation Facility - City of Fort Myers
New Construction, Infrastructure
Conception
$3,000,000 CJ est. value
Fort Myers, FL 33905

Pine Lake Preserve Stormwater Management - City of Bonita Springs
Infrastructure
Conception
$347,818 CJ est. value
Bonita Springs, FL 34135

The Homes at 81 West
New Construction, Infrastructure
Design
$2,000,000 CJ est. value
Fort Myers, FL 33912

Skyline Boulevard Retail
New Construction, Infrastructure - 4,000 SF
Design
$1,000,000 CJ est. value
Cape Coral, FL 33914

Tier 1 Side Streets Water and Stormwater Improvements
Infrastructure
Bidding
$20,859,854 CJ est. value
Fort Myers Beach, FL 33931

Tier 1 Side Streets Water and Stormwater Improvements
Infrastructure
Bidding
$20,859,854 CJ est. value
Fort Myers Beach, FL 33931

Wawa #5237 / Fort Myers
New Construction, Infrastructure - 6,421 SF
Post-Bid
$1,400,000 CJ est. value
Fort Myers, FL 33912

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Wastewater Lift Station Preventative Maintenance and Repair Services
Renovation
Results
Sanibel, FL

Water, Sewer, and Irrigation Materials
Term Contract
Results
FL

Porsche / Fort Myers
Demolition, New Construction, Infrastructure - 67,632 SF
Construction
$700,000 CJ est. value
Fort Myers, FL 33913

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Cape Coral Yacht Club Renovations - City of Cape Coral
Infrastructure
Pending Verification
$60,000,000 CJ est. value
Cape Coral, FL 33904

RV One Superstore of Fort Myers
New Construction, Infrastructure - 30,000 SF
Pending Verification
$6,750,000 CJ est. value
Fort Myers, FL 33905

ADM-76 Nicholas/Country Club Repipe - City of Cape Coral
Infrastructure
Conception
$12,450,000 CJ est. value
Cape Coral, FL 33990

Last Updated 07/11/2023 09:07 AM
Project Title

Professional Engineering and Design Services for the North 3 Utilities Extension Project (UEP)

Physical Address View project details and contacts
City, State (County) Cape Coral, FL 33904   (Lee County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $211,473,398 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 11, 2023, a design firm has not been selected as of yet. Although a firm timeline for construction has not been determined, construction is not expected to start prior to 2024/2025. *The closed solicitation has been included below for reference: The selected Engineering Firm will perform all necessary work required to provide hydraulic modeling, design, permitting and bid ready construction documents for the North 3 Utilities Extension Project (UEP) including but not limited to: new water, sewer and irrigation mains, new wastewater lift stations, replacement of existing storm drain systems, fiber optic conduit, and reconstruction of existing roads. Bidding and Design Services during construction are also included. The City reserves the right to add Construction Engineering & Inspection (CEI) services by a separate agreement. Accordingly, the City would like all Firms to include their qualifications for CEI services for a project of this size and magnitude. All Prospective Bidders/respondents Are Hereby Cautioned Not to Contact Any Member of the City of Cape Coral Staff or Officials Other Than the Specified Contact Person. Question Please confirm the due date is 6/20/2023. The RFP - North 3 Professional Services - RCP2379JM.pdf lists 6/7/2023 as the deadline. Thank you. The City reserves the right to reject any or all bids/proposals in whole or in part and to waive any irregularities or informalities when in the best interest of the citizens of the City of Cape Coral. The method of Contractor Selection has not been Determined at this time Questions Deadline: 6/2/2023 04:00 PM (ET) Response Deadline: 6/20/2023 02:00 PM (ET)

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents