Similar Projects
Last Updated | 09/16/2023 02:31 AM |
Project Title | Chequamegon/Nicolet Nursery Bridge |
Physical Address | View project details and contacts |
City, State (County) | Butternut, WI 54514 (Ashland County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected November 2023 |
Bids Due | View project details and contacts |
Estimated Value | $3,000,000 [brand] Estimate |
Plans Available from | Agency's Affiliate - 08/24/23 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Chequamegon/Nicolet Nursery Bridge Project Description Project is a total small business set-aside under NAICS Code 237310 $45M. Project magnatude is betweeen $1M and $3M. NURSERY ROAD (FR162) OVER EAST FORK CHIPPEWA RIVER Project is near Butternut, WI Full replacement of existing 5 span sawn timber bridge with a new 3 span bridge. New bridge will consist of a steel H-pile with poured reinforced concrete wall abutment and pier substructure, a glulaminated treated timber girder superstructure, a glulaminated treated timber deck with glulaminated treated timber rails and an asphalt paved wearing surface. Allow steel angle diaphragms Item 55901 Membrane Waterproofing to be an optional bid item. Alternative superstructure/ deck/ and railing combinations are allowed. All must meet HL-93 loading requirements, L/500 max deflection, match clear width geometry of planned bridge, structure depth not to exceed planned dimension (48"). If structure depth is less than planned, hold top of substructure elevations as planned and lower roadway elevations accordingly. Rail must be timber TL2 minimum but alternative designs may be accepted Allow dowel laminated deck panels with ship-lap joints in lieu of glulam Allow steel girders in lieu of glulam Allow panel-lam longitudinal timber slab Allow solid sawn Allow concrete I - beam If alternative superstructure/deck/railings is proposed, provided alternative preliminary plans and alternative bid schedule along with bid or proposal for planned structure. OF CONSTRUCTION PROJEC Project is estimated between $1,000,000 and $3,000,000. TRAVEL NORTH ALONG STH 13 FROM THE INSTERSECTION OF STH 13 AND CTH F IN THE VILLAGE OF BUTTERNUT FOR APPROXIMATELY 0.8 MILES. TURN LEFT ONTO BEAR LAKE ROAD AND TRAVEL WEST APPROXIMATELY 9 MILES. TURN LEFT ONTO BEAR LAKE ROAD (FH 163) AND TRAVEL SOUTHWEST FOR APPROXIMATELY 5 MILES. TURN RIGHT ONTO NURSERY ROAD (FH 162) AND TRAVEL NORTH APPROXIMATELY 0.5 MILE TO THE NURSERY ROAD BRIDGE. 45.9909 degrees Latitude, -90.7687 degrees Longitude (4) The Offeror may submit any questions with regard to this report by email to NDAA1290Cert@state.gov. To the extent feasible, the Department of State will respond to such email inquiries within 3 business days. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||||||||||||||||
Details |
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |