Similar Projects
Last Updated | 02/16/2024 12:03 AM |
Project Title | Beale AFB Utility Well #9 |
Physical Address | View project details and contacts |
City, State (County) | Beale AFB, CA 95903 (Yuba County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected March 2024 , Request For Proposals |
Bids Due | View project details and contacts |
Estimated Value | $2,000,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This is a pre-solicitation, no offers will be made at this time. Major Work Elements The Contractor shall furnish all design, labor, supervision, transportation, materials, testing, analysis, reports, permits, specifically air quality authority to construct permit, hauling, tools, and equipment to accomplish all the work involved as necessary to conduct replacement of well #9 : 1. Repair by Replace Water Well #9 Contractor shall drill and install new water well, pump, and control system with industry standard casing to a sufficient depth capable of maintaining flow of 1,200 gallons per minute (GPM) to the existing drinking water supply piping network. Well installation shall be completed by a State of California C-57 licensed drilling contractor. Contractor shall provide new concrete pad estimated to be 6 feet by 10 feet and raised to 24 inches above grade to conform to 100-year flood standards. Contractor shall furnish new downhole water level sensing equipment to be connected to Siemens automated system. Well shall conform to all local, state, regional and federal requirements for a community drinking water supply well, including sanitary/annular to a required depth, not less than 50ft. 2. Electrical The well system will be powered by existing electrical transformer power (3 phase 480V). Existing electrical power is provided by a pole mounted transformer. A current project is removing the overhead power and replacing it with an underground duct bank and pad mounted transformer. This project will connect to whatever is existing at the time of well installation. Contractor shall provide new 75 horsepower submersible well pump, wiring, Pump controller (VFD) and associated parts and equipment. Upgrade existing water flow meter with new water flow meter. 3. Plumbing Modify existing piping as required to connect with new well. All piping shall meet appropriate code requirements and at a minimum shall match existing systems. Contractor shall provide new gate valve for water supply piping and flush piping. 4. Fencing Contractor shall remove existing fencing around well piping and foundation, saving fence caps for re-use with barbed wiring. Contractor shall install new chain link fencing with barbed wire topping around new well and associated piping. 5. Well Decommission Contractor shall provide well destruction plan to decommission the existing well to satisfy Yuba County permit requirements. Proper abandonment and sealing of existing Well #9 in accordance with local, state, regional and federal requirements. 6. Disposal The Contractor shall coordinate with 9CES Environmental staff to determine proper disposal requirements for materials, which may include on-base recycling, hazardous waste disposal, or non-hazardous waste offsite disposal. It shall remain the responsibility of the Contractor to haul and dispose of removed materials identified for offsite disposal. All fees to dispose material offsite shall be the responsibility of the Contractor. The Contractor shall contact 9CES Hazardous Waste Program Manager for proper disposal details and required coordination and documentation references. Coordination shall also be made with 9CES Environmental regarding recycling. This acquisition will be set aside for Small Business concerns. In accordance with DFAR 236.204 - Disclosure of Magnitude on Construction Projects, the estimated cost is: Between $500,000 and $1,000,000.. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |