Similar Projects
Surfside Crossing
New Construction
Conception
Nantucket, MA 02554

Anchor Point Phase 3
New Construction
Conception
Beverly, MA 01915

Brewster Road Apartments
New Construction - 38,300 SF
Design
Brewster, MA

Birch Street Place
New Construction - 205,990 SF
Design
$10,000,000 CJ est. value
Milford, MA 01757

OPM Services for Maintenance Facility Project and Outdoor Pool Complex Project at the South Shore Country Club
Post-Bid
$2,200,000 est. value
Hingham, MA 02043

Construction of a New Fairbank Community Center
Post-Bid
Sudbury, MA 01776

North Andover Adult Center - General Bid
New Construction - 13,000 SF
Results
Less than $6,982,500 est. value
North Andover, MA

Community Center Project Management
Results
Less than $13,000,000 est. value
Dover, MA 02030

Langwood Commons
New Construction - 350,000 SF
Construction
$50,000,000 to $60,000,000 est. value
Stoneham, MA

Nashawtuc Country Club
Renovation, Addition - 55,000 SF
Construction
Concord, MA

Loring Boulevard Apartments
New Construction
Pending Verification
Plymouth, MA 02360

Mildred C Hailey - Phase One Development
New Construction - 735,500 SF
Pending Verification
Jamaica Plain, MA

Forest Lake Seasonal Cottages
New Construction - 17,650 SF
Design
Palmer, MA 01069

North Andover Adult Center - Filed Sub-Bids
New Construction - 13,000 SF
Results
Less than $6,982,500 est. value
North Andover, MA 01845

Sunwood Development Apartments
New Construction - 4,000 SF
Construction
$10,000,000 est. value
Northampton, MA 01060

Reported 07/08/2021 01:42 PM
Project Title

Oak Grove Clubhouse Renovation

Physical Address View project details and contacts
City, State (County) Melrose, MA 02176   (Middlesex County)
Category(s) Entertainment/Recreation
Sub-Category(s) Clubhouse/Social Club
Contracting Method
Project Status Construction Commenced September 2020, Construction Complete as of April 2021
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Phased Construction: #1 Locker Building #2 Clubhouse Renovation

Details

1 Clubhouse/Social Club, 7,575 SF New Construction, 1 Clubhouse/Social Club, Demolition, Clubhouse/Social Club, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents