Similar Projects
Reported | 04/15/2022 12:00 AM |
Project Title | Gutter Work |
Physical Address | View project details and contacts |
City, State (County) | Centralia, IL (Marion County) |
Category(s) | Single Trades |
Sub-Category(s) | Roofing |
Contracting Method | Competitive Bids. |
Project Status | Bidding, Construction Start Expected May 2022 |
Bids Due | View project details and contacts |
Estimated Value | $200,000 [brand] Estimate |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Provide pricing for acceptable finished guttering work (through replacement or adding new). There will be downspout drain lines installed before the new gutters are installed. Fit downspout into downspout drain line. Downspouts must extend into the transition, not left above it. Do not glue. Gutter should be installed behind drip edge. Hangers should be installed and secured with no more than 3 between hangers. Gutters, downspouts, straps and drain line transition pieces all to be white in color. Gutters should extend 1/2 " to 3/4 " beyond the shingles at the end of every gutter run. Gutter guards should be quoted as an additional option |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |