Similar Projects
Harmon Street Reconstruction And Water Main Replacement
Bidding
Less than $1,500,000 est. value
Saint Clair Shores, MI

Meter Maintenance
Post-Bid
Clinton Township, MI

Drop Shaft and Connecting Sewer Rehab-ST-S-4, ST-S-5 and UT-S-1
Post-Bid
Clinton Township, MI

2019 30 Mile Water Main Extension
Results
MI

Lipke Road Water Main Replacement
Results
Less than $277,973 est. value
Clinton Township, MI

Water Pipe and Fittings and Hydrants
Post-Bid
Mount Clemens, MI 48043

Donald Avenue Water Main Replacement Stephens to Toepfer
Results
Less than $1,400,000 est. value
Eastpointe, MI

Water Meter Replacement Program
Term Contract
Post-Bid
Sterling Heights, MI

Clinton River WM Replacement - Water Main Replacement Project - Clinton River Road
Results
Less than $730,128 est. value
Clinton Township, MI

2020 DWRF Project –14 Mile Road Water Main and PRV’SDWRF Project No. 7425-01Andutica Road Water Main –13 Mile Road to 14 Mile Road
Results
Less than $6,200,000 est. value
Fraser, MI

DWRF Water Main Replacement and PRV Installation
Results
Fraser, MI

Utility Structure and Concrete Repair
Term Contract
Results
Less than $12,280 est. value
MI

Gate Valves
Results
Mount Clemens, MI

Beste Reconstruction and Water Main Replacement
Results
Saint Clair Shores, MI

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Last Updated 07/21/2020 09:23 AM
Project Title

2020 Mound Road Water Main Extension (North of 30 Mile Road to 31 Mile Road)

Physical Address View project details and contacts
City, State (County) Washington, MI   (Macomb County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of installation of approximately 5430’ of 16” D.I. CL 54 water main and adjacent gate valves, gate wells, and hydrants along Mound Road from north of 30 Mile Road to 31 Mile Road. Consists mainly of open cut along with driveway & pathway replacement in open cut areas and pathway extension to 31 Mile Road. An alternate bid is also included to potentially substitute the 16” D.I. CL 54 water main pipe with either 16” PVC C900 Class 235 or 16” PVCO C909 Class 235 water main pipe.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents