RFP Design - Construction of 3 Bridge Structures - 66th Street South East Railroad Overpass Project
Infrastructure
Conception
$700,000 CJ est. value
Bismarck, ND 58504

RFP Design - Construction of 3 Bridge Structures - 66th Street South East Railroad Overpass Project
Infrastructure
Conception
$700,000 CJ est. value
Bismarck, ND 58504

Hangar 5 Disposition - City of Bismarck
Demolition, Infrastructure
Design
$500,000 CJ est. value
Bismarck, ND 58504

Cottonwood Parkview Addition
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Bismarck, ND 58501

ADA Curb Ramps, Median Islands, Signal Improvements, Rrfb, Milling, Hot Mix Asphalt, Concrete Pavement, Sidewalks, Curb and Gutter, Aggregate Base Course
Infrastructure
Bidding
$5,500,000 CJ est. value
Baldwin, ND 58521

ADA Curb Ramps, Median Islands, Signal Improvements, Rrfb, Milling, Hot Mix Asphalt, Concrete Pavement, Sidewalks, Curb and Gutter, Aggregate Base Course
Infrastructure
Bidding
$5,500,000 CJ est. value
Baldwin, ND 58521

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Gravel Hauling for Township Roads
Term Contract
Post-Bid
Bismarck, ND 58501

ND 36, JCT US 83 (Wilton) E TO JCT ND 14 (Wing) - Seal Coat and Incidentals
Infrastructure
Results
$600,001 to $800,000 est. value
ND

Old Red Trail Commercial 2nd Addition
Infrastructure
Results
$797,000 to $1,050,000 est. value
Bismarck, ND

Bismarck State College Polytechnic Building - BP #1
New Construction, Renovation, Infrastructure - 89,700 SF
Construction
$38,000,000 CJ est. value
Bismarck, ND 58506

Bismarck State College Polytechnic Building - BP #1 (Partial Re-bid)
Demolition, New Construction, Infrastructure
Construction
$38,000,000 CJ est. value
Bismarck, ND 58506

Marquis Subdivision Self Storage
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Bismarck, ND 58504

Marquis Subdivision Self Storage
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Bismarck, ND 58504

RFP Engineering - Burnt Creek River Crossing Within 28th Street NW Project
Infrastructure
Conception
$200,000 CJ est. value
Hay Creek, ND 58503

Last Updated 10/10/2023 05:04 AM
Project Title

Bismarck Wastewater Treatment Facility Effluent Flood Control Improvements

Physical Address View project details and contacts
City, State (County) Bismarck, ND 58504   (Burleigh County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Maintenance, Paving/Reconstruction, Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $1,217,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

The overall Project scope will be ONE Bid Package for the following work: Bid Package No. 1: All Work 1. All labor, equipment, materials, and services necessary to divert flows from the existing WWTP outfall pipe into the diversion channel upstream of the Tavis Road Stormwater Pump Station when River levels are high and to isolate the existing outfall pipe from the Missouri River during a flood event. 2. Construction of one (1) new concrete diversion structure with two (2) slide gates, outfall piping, and riprap. 3. Construction of one (1) new concrete isolation structure containing one (1) slide gate and outfall piping. 4. Furnish and install miscellaneous traffic control, erosion control, and bypass pumping to complete the installation of structures as shown in the contract documents. 5. Removal, salvaging, and replacement of topsoil, existing riprap, and trees as required. 6. Finish grading of areas to be seeded that were disturbed during construction and complete permanent seeding. 7. Site cleanup, road restoration, and all other miscellaneous work required, not herein mentioned, but inferred from the construction contracts. Examination of Bidding Documents: Complete digital Project Bidding Documents are available at www.pkg-inc.com. You may download the digital plan documents by obtaining a code by contacting Jordan Bonnet at PKG, Jordan@pkg-inc.com, estimating@pkg-inc.com, or call 701 232-3878 for assistance. The Bidding Documents may be seen and examined at the office of PKG Contracting, Inc. (PKG), 4301 S. University Drive, Fargo, ND 58104. All Work shall be done according to the Bidding Documents Technical bid questions shall be directed to Russ Sorenson, PE at 701-527-2451 or email at russ@PKG-inc.com. Only questions submitted by email and answered by addenda are binding to the bids. The Construction Performance Bond may be used at the discretion of the CMAR and payable to PKG Contracting, Inc. Insurance, as required, shall be provided by the successful Bidders and certificate(s) of that insurance shall be provided. CMAR reserves the right to waive bond requirements prior to award. All Bidders shall strictly follow the directions outlined in the CMAR s Bid Package and Instructions to Bidders when submitting their Bid Form. Bidders shall enclose a copy of their license or Certificate of Renewal with the Bid Form. No Bid will be considered unless it fully complies with the license requirements. All Bids will be made on the basis of cash payment for such Work. PKG reserves the right to reject any and all Bids, to waive irregularities and informalities, and to award the Contracts for each respective Bid Package in the best interests of the Project. PKG reserves the right to hold the three (3) low Bids for a period of sixty (60) days after the date of the Bid opening. The Work for each contract must be completed in accordance with the dates outlined in the Specifications

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents