Similar Projects
Sawmill Mixed Use Future Phases
New Construction, Infrastructure
Conception
$200,000,000 CJ est. value
Summerville, SC 29483

Intersection Improvement S-169 (Von Ohsen Rd)/S-881 (Lincolnville Rd)
Infrastructure
Conception
$2,100,000 CJ est. value
Summerville, SC 29485

Limehouse Drive/Multi-Residential
New Construction, Infrastructure
Design
$18,000,000 CJ est. value
Summerville, SC 29485

Downtown Nexton Mixed-Use
New Construction, Infrastructure - 310,000 SF
Design
$100,000,000 CJ est. value
Summerville, SC 29483

RFP D/B - Bridge Replacement Program, A Design-Build Project
Demolition, New Construction, Infrastructure
Bidding
$5,000,000 CJ est. value
Saint George, SC 29477

Uptown/Little Harlem Neighborhood Improvements
Infrastructure
Bidding
$420,000 CJ est. value
Saint George, SC 29477

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Harris Teeter Fuel Center #355 / Summerville
Demolition, New Construction, Infrastructure, Renovation
Post-Bid
$800,000 CJ est. value
Summerville, SC 29485

Navy Base Intermodal Facility Advanced Work Package project
Demolition, Infrastructure
Results

North Maple Extension Project - Re-Bid
Infrastructure
Results
$21,089,225 CJ est. value
Summerville, SC 29483

Wastewater Treatment Plant Expansion and Improvements
Infrastructure
Construction
$10,000,000 CJ est. value
Summerville, SC 29483

The Ponds - Phase 6
New Construction, Infrastructure
Construction
$66,000,000 CJ est. value
Summerville, SC 29483

Coastal Crossroad Logistics Center Phase 1 and 2
New Construction, Infrastructure - 2,500,000 SF
Pending Verification
$200,000,000 CJ est. value
Summerville, SC 29483

BID Group Wood Processing Expansion
Addition, Demolition, Infrastructure
Pending Verification
$10,600,000 CJ est. value
Saint George, SC 29477

FlexCold Patriot Boulevard Cold Storage Warehousing / North Charleston
New Construction, Infrastructure
Conception
$49,900,000 CJ est. value
Summerville, SC 29485

Last Updated 05/03/2023 08:01 PM
Project Title

500 N. Main Street Redevelopment Opportunity

Physical Address View project details and contacts
City, State (County) Summerville, SC 29483   (Dorchester County)
Category(s) Heavy and Highway, Medical
Sub-Category(s) Hospital, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected July 2024 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $30,000,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The County is seeking proposals from developers to create a mixed-use destination in downtown Summerville, SC related to the project defined in the Request for Proposals. As of May 3, 2023, a design team has been identified. A construction timeline has not been established yet. The method of contractor selection has not been determined at this time.

Details

27,739 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Joists, Metal Support Assemblies, Healthcare Metal Supports.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Painting.
Division 10 - Specialties, Compartments and Cubicles, Toilet Compartments, Partitions, Service Walls, Patient Bed Service Walls, Wall and Door Protection, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Protective Covers.
Division 11 - Equipment, Mercantile and Service Equipment, Vending Equipment, Foodservice Equipment, Ice Machines, Cleaning and Disposal Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Operating Room Equipment, Solid Waste Handling Equipment.
Division 12 - Furnishings, Window Blinds, Casework, Furniture, Seating, Institutional Furniture, Healthcare Furniture.
Division 13 - Special Construction, Radiation Protection.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Substations, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems, Healthcare Intercommunications and Program Systems, Healthcare Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Fire Detection and Alarm, Radiation Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents