Reported | 06/22/2022 11:02 AM |
Project Title | Kline Boulevard Area Stormwater Improvements - 350010 - City of Frederick |
Physical Address | View project details and contacts |
City, State (County) | Frederick, MD 21701 (Frederick County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Storm/Sewers |
Contracting Method | Competitive Bids. |
Project Status | Conceptual Design, Construction Start Expected March 2024 |
Bids Due | View project details and contacts |
Estimated Value | $550,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Site work for a water / sewer project in Frederick, Maryland. Conceptual plans call for site work for a water / sewer project. The purpose of this project is to analyze the capacity of the existing stormwater infrastructure in this approximately 170 acre drainage basin in the Carroll Creek watershed and develop and implement measures to alleviate flooding and provide for the safe conveyance of stormwater. The stormwater system in this location ultimately outfalls to Carroll Creek along Carroll Parkway. This area is heavily developed, with the U.S. Route 40 and U.S. Route 15 interchanges located in the center of the watershed, with commercial development in the northwest and southeast portions, and residential development in the southwest and northeast portions. Frederick High School and West Frederick Middle School are located just outside of the watershed to the northeast but are impacted by flooding that originates within this watershed. Deliverables associated with this project are: A study of the drainage basin to with recommended options for design and associated cost estimates (COMPLETE) , Designs for the selected recommended improvements including Construction Documents and Specifications ready for bid (FY23) ,Acquisition of required rights-of-way or easements (FY23) ,Acquisition of required permits (FY23),Construction of selected recommended improvements (FY24). This project is in included in the City's or County's FY 2023-2028 Capital Improvement Plan (CIP). As of June 21, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |