Similar Projects
Middlesex IM 089-2 (50)
Bidding
$1,000,000 to $2,500,000 est. value
Middlesex, VT

Williston STP SCRP (17)
Bidding
$1,000,000 to $2,500,000 est. value
Williston, VT

Newbury Elementary School Drainage/ Grading Work and Concrete Wall Replacement
Post-Bid
Newbury, VT 05051

2020 Grants in Aid Project
Post-Bid
Norwich, VT 05055

River Bank Retaining Wall Replacement
Results
$1,600,000 est. value
Springfield, VT

ANR-FWL Dummerston Fishing Access Improvements
Results
$110,000 est. value
Dummerston, VT

Cady Road Culvert No. 1 Replacement Project
Bidding
$118,000 est. value
Middlebury, VT

SFY2021 Deer Brook Gully Stabilization and Stormwater Mitigation Project
Post-Bid
Less than $400,000 est. value
Georgia, VT

Cranberry Hill Culvert
Results
Winhall, VT

Box Culvert Replacement Design/Build
Bidding
$130,000 est. value
Sharon, VT

Middlebury River Flood Resiliency Project
Post-Bid
Middlebury, VT

Design, Engineer and Install a Box Culvert on Lottery Lane
Results
Weathersfield, VT

Construction for Ditching and Culvert Replacement on Turnpike Road and Alger Brook Road
Bidding
Strafford, VT

Little Kidder Brook Culvert
Results
Stratton, VT 05360

390 Harrington Road Culvert
Results
West Windsor, VT

Reported 08/10/2020 12:00 AM
Project Title

Shady Rill Recreation Area Streambank Restoration - Phase 3 Implementation

Physical Address View project details and contacts
City, State (County) Middlesex, VT   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Relocate all encroachment features including up to four grilling sites and one shelter structure. 2. Remove existing access drive and install new 12’ wide gravel drive in new location outside of stream buffer zone. Install new parking spaces and vehicle turnaround location. 3. Reconfigure paved drive entrance and install boulders at specific locations to direct vehicle traffic. 4. Install four hardened access paths and three sets of stone steps into Martins Brook. 5. Regrade and bench streambank in preparation for coir roll installation. Place down erosion control blankets and seed banks to overwinter.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents