Similar Projects
South Street Lift Station Replacement - SEW-23-001 - City of Burlington
Infrastructure
Conception
$4,700,000 est. value
Burlington, IA 52601

Grand Avenue Traffic Signal Timing Systems - City of Spencer
Infrastructure
Conception
$200,000 CJ est. value
Spencer, IA 51301

HMA Resurfacing With Milling - I-35
Infrastructure
Design
$500,000 CJ est. value
Latimer, IA 50452

PCC Curb and Gutter
Infrastructure
Design
$500,000 CJ est. value
Le Mars, IA 51031

Municipal Water Well Improvements
Infrastructure
Bidding
$1,131,320 CJ est. value
Dayton, IA 50530

Dewey's Pasture WMA - Smith Slough Road Maintenance Rebid
Infrastructure
Bidding
$130,000 CJ est. value
Ruthven, IA 51358

Drainage District No 82 Open Ditch and Lateral B Cleanout
Infrastructure
Post-Bid
Algona, IA

Bnsf Slope Stabilization
New Construction, Term Contract
Post-Bid
Avery, IA

Cedar Lane Culvert Replacements
Results
$431,000 est. value
Waverly, IA

Middle Cedar WMA Flood Mitigation Structures
Results
$1,116,000 est. value

Poplar Avenue Traveler's Center
New Construction, Infrastructure - 10,000 SF
Pending Verification
$6,000,000 CJ est. value
Fort Dodge, IA 50501

Roads - City of Fort Dodge
Infrastructure
Pending Verification
$141,450 CJ est. value
Fort Dodge, IA 50501

Northwest Iowa Regional Airport Master Plan - City of Spencer
New Construction, Infrastructure
Conception
$10,000,000 CJ est. value
Spencer, IA 51301

Gibson Memorial Library
Addition, Renovation, Infrastructure - 8,000 SF
Design
$4,700,000 CJ est. value
Creston, IA 50801

Bridge Replacement - PPCB
Demolition, New Construction, Infrastructure
Bidding
$7,500,000 CJ est. value
Yorktown, IA 51632

Last Updated 10/18/2022 04:05 PM
Project Title

Cardinal Pond Improvements - PAR-I-POND - City Of Newton

Physical Address View project details and contacts
City, State (County) Newton, IA 50208   (Jasper County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2025
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project would install improvements such as trails, an ADA-accessible fishing pier, and other possible enhancements at Cardinal Pond. The project is included in the city's 2023-2027 Capital Improvement Program (CIP). As of October 18, 2022, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents