Similar Projects
4Front Office And Industrial Area Expansion
Addition, Infrastructure - 310,000 SF
Conception
Oakdale, MN

Tap Society Restaurant
New Construction, Infrastructure - 3,500 SF
Conception
$500,000 to $1,000,000 CJ est. value
Rosemount, MN 55068

2022 City Sidewalk Repairs
Infrastructure
Bidding
$40,000 est. value
Waseca, MN

East Main Street Resurfacing - TH 65 to CSAH 38
Infrastructure
Bidding
Albert Lea, MN 56007

Milling, Stabilized Full Depth Reclamation, Full Depth Reclamation, Bituminous Surfacing, Aggregate Shoulders (Modified), Bituminous Seal Coat
Post-Bid
Wheaton, MN

West Bridge Street Reconstruction
Post-Bid
$3,400,000 est. value
Owatonna, MN

In Scott County on T.H. 169 Approx. 2200' South Of 173Rd St. W. Grading, Building Removal and Drainage
Results
MN

Creekside Hills Trail
Results
Less than $188,000 est. value
Plymouth, MN

LEECH LAKE BAND OF OJIBWE
Infrastructure
Construction
Cass Lake, MN

Bituminous Paving of 213th Avenue
Infrastructure
Bidding
Payne, MN

2021 Bituminous Project
Post-Bid
Long Prairie, MN

2021 Pavement Improvement
Results
Afton, MN

Mille Lacs Kathio New Waterline
Infrastructure
Bidding
Onamia, MN 56359

1690 Minimum Maintenance Road Repair
Renovation
Post-Bid
MN

Fish Point Road (CSAH 44 to TH 13) Reconstruction Project Phase 1
Results
Prior Lake, MN 55372

Last Updated 01/10/2022 05:43 AM
Project Title

2022 Street and Utility Improvements

Physical Address View project details and contacts
City, State (County) Kellogg, MN   (Wabasha County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Common Excavation 1000 Cy Aggregate Base Class 5 650 Cy Concrete Curb & Gutter 860 Lf Bituminous Pavement 500 Ton 6"-7" Concrete Driveway 180 Sy 4"-6" Concrete Walk 1200 Sf Seed, Fertilize & Mulch 500 Sy 6"-8" Pvc Watermain 480 Lf 8" Gate Valve & Box 4 Ea 1" Water Service 200 Lf 12"-18" Storm Sewer 340 Lf Construct Storm Structure 25 Lf

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents