Similar Projects
RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

I-70 Design-Build Added Travel Lanes and Pavement Replacement from SR-1 to IN/OH State Line
Infrastructure
Results

2021 CCPP Milling, Leveling and Resurfacing
Infrastructure
Post-Bid
Tipton, IN

2021-2 Community Crossing Matching Grant Project
Infrastructure
Results
Tipton, IN

Superstructure Replacement on SR 28, SR 32, and SR 1 - 1903 - Indiana Department Of Transportation
Demolition, New Construction, Infrastructure
Pending Verification
$15,179,458 CJ est. value
Tipton, IN 46072

Superstructure Replacement on SR 28, SR 32, and SR 1 - 1903 - Indiana Department Of Transportation
Demolition, New Construction, Infrastructure
Pending Verification
$15,179,458 CJ est. value
Tipton, IN 46072

Superstructure Replacement on SR 28, SR 32, and SR 1 - 1903 - Indiana Department Of Transportation
Demolition, New Construction, Infrastructure
Pending Verification
$15,179,458 CJ est. value
Tipton, IN 46072

RFP Engineering - Project Development Services Pavement Replacement (Small Town Reconstruction) in the Town of Tipton
Infrastructure
Post-Bid
$9,774,151 CJ est. value
Tipton, IN 46072

RFP Engineering - Project Development Services Pavement Replacement (Small Town Reconstruction) in the Town of Tipton
Infrastructure
Post-Bid
$9,774,151 CJ est. value
Tipton, IN 46072

RFP Engineering - Project Development Services Pavement Replacement (Small Town Reconstruction) in the Town of Tipton
Infrastructure
Post-Bid
$9,774,151 CJ est. value
Tipton, IN 46072

Tri-Central Maintenance Barn Addition REBID
Addition, Demolition, Infrastructure - 12,020 SF
Results
$599,500 CJ est. value
Sharpsville, IN 46068

New Public Works Facility - Bid Packages 2 to 25
New Construction, Infrastructure
Post-Bid
$5,866,000 CJ est. value
Tipton, IN 46072

CCMG 2022-2 Paving Project
Infrastructure
Post-Bid
$400,000 CJ est. value
Tipton, IN 46072

CCMG 2022-2 Paving Project
Infrastructure
Post-Bid
$400,000 CJ est. value
Tipton, IN 46072

CCMG 2022-2 Paving Project
Infrastructure
Post-Bid
$400,000 CJ est. value
Tipton, IN 46072

Last Updated 04/07/2023 05:31 PM
Project Title

Tipton County 2022-2 CCMG Project CR 560 W / CR 550 W From SR 28 to Division Road

Physical Address View project details and contacts
City, State (County) Tipton, IN 46072   (Tipton County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $926,046 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

For Tipton County 2022-2 CCMG Project CR 560 W / CR 550 W From SR 28 to Division Road The proposed construction will include scarify milling and/or 1.5" milling of the existing roadway along with a 1.5-inch HMA Surface overlay. Pavement Removal and full depth HMA Paving on 5" Compacted Aggregate on Subgrade Treatment IBC and all incidental work required, as more fully specified in the Contract Documents and Plans. All proposals must be submitted on State Board of Accounts Form No. 96 together with the proper forms included in the Contract Documents, the entire set of which shall be filed intact as a bid. The contract documents are available electronically Any person, firm or corporation who submits a proposal MUST file with their bid a CERTIFIED CHECK, BANK DRAFT, CASHIER'S CHECK OR MONEY ORDER issued by a financial institution insured by an agency of the United States in the amount of five percent (5%), made payable to the Treasurer of Tipton County. In lieu of the above, any person, firm or corporation who submits a proposal and has a principal place of business in the State of Indiana MAY file with their proposal a BID BOND in the amount of five percent (5%), made payable to the Board of Commissioners of Tipton County. Proposals may be held by the Board of Commissioners for a period not to exceed sixty (60) calendar days from the public opening. The successful Contractor will be required to furnish a Performance Bond and Payment Bond in the amount of one hundred percent (100%) of the contract price, each, within ten (10) days after award of the contract and a two (2) year Maintenance Bond in the amount of thirty percent (30%) of the contract price prior to completion and final payment of the contract. No Contractor may withdraw his proposal within sixty (60) days after the actual date of the opening thereof. The Tipton County Board of Commissioners reserves the right to ask for clarification for any bid submitted. In comparing bids, consideration will not be confined to price only. The successful bid will be the lowest responsible and responsive bidder, however the Board of Commissioners reserves the right to reject any proposal, to waive technicalities or irregularities therein, to delete any bid item or items and to award a contract on the proposal that in their judgment is most advantageous to Tipton County.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents