Similar Projects
Urban Grading, PCC Surfacing, Storm Sewer, Curb and Gutter, Sidewalk, Lighting, Signals
Infrastructure
Conception
$10,576,000 CJ est. value
Huron, SD 57350

Urban Grading, PCC Surfacing, Storm Sewer, Curb and Gutter, Sidewalk, Lighting, Signals
Infrastructure
Conception
$10,576,000 CJ est. value
Huron, SD 57350

SD63 - Fm the Us212 E Jct to N of the Moreau River
Infrastructure
Design
$14,249,000 CJ est. value
Trail City, SD 57657

SD63 - Fm the Us212 E Jct to N of the Moreau River
Infrastructure
Design
$14,249,000 CJ est. value
Trail City, SD 57657

2023 Street Project
Infrastructure
Bidding
$100,000 CJ est. value
Bruce, SD 57220

2023 Street Project
Infrastructure
Bidding
$100,000 CJ est. value
Bruce, SD 57220

Road Maintenance
Term Contract
Post-Bid
SD

2022 Gravel, Road Blading, Snow Removal, and Road Mowing
Term Contract
Post-Bid
SD

Bridge Deck Sweeping in the Aberdeen Area
Infrastructure
Results
Aberdeen, SD

Bridge Deck Sweeping in the Watertown Area
Infrastructure
Results
Watertown, SD

Bond New Elementary School - Vermillion School District 13-1
Demolition, New Construction, Renovation, Infrastructure
Construction
$26,000,000 CJ est. value
Vermillion, SD 57069

2022 Bond - Brookings School District
New Construction, Build-out, Infrastructure
Pending Verification
$23,000,000 CJ est. value
Brookings, SD 57006

Clay County Jail - Clay County
New Construction, Infrastructure
Pending Verification
$39,000,000 CJ est. value
Vermillion, SD 57069

Shoulder Widening, Mill, AC Resurfacing, Replace Str Bridge, Approach Grading, Pipework; Signal, Crossing Surface
Infrastructure
Conception
$11,673,000 CJ est. value
Elkton, SD 57026

Replace Str (RCBC), Approach Grading
Infrastructure
Design
$1,852,000 CJ est. value
Custer, SD 57730

Last Updated 06/07/2023 08:06 AM
Project Title

Guardrail Repair and/or replacement due to damage on I-90

Physical Address View project details and contacts
City, State (County) Kadoka, SD 57543   (Jackson County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Department of Transportation in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C. 2000d to 2000d-4, and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A, Office of the Secretary, Part 21, Nondiscrimination in Federally-assisted programs of the Department of Transportation issued pursuant to such Act, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on grounds of race, color, religion, national origin, sex, age, or disability in consideration of an award. Any addenda will be posted on the regional letting website no later than 5:00 P.M. Central Time on Thursday, June 1, 2023. It will be the Contractor's responsibility to verify that no addenda have been posted prior to submitting bids. Every addenda posted on the website will have a cover sheet attached to it that the contractor will be required to include with their bid. Failure to incorporate changes made through addenda and not submitting all cover sheets will result in an incomplete bid which will subsequently be rejected. A bid bond will not be required for this contract; however, at the time of execution of the contract, the successful bidder shall furnish a performance bond in a sum equal to the full amount of the contract. Note: A cashier's check, money order or other monetary instrument in the total amount of the contract, made out to and under the full control of the Department, is acceptable in lieu of a performance bond. Such bond shall remain in effect for not less than one year after date of acceptance of the completed contract by the Department. Prequalification for bids greater than or equal to $250,000 will be required. If prequalification is required the bidder must be prequalified in accordance with: Work Type 13 - Incidental Construction. . Questions regarding the plans/proposal should be directed to: Doug Sherman at 605-842-0810 - Winner Area Engineer Brad Norrid at 605-842-0810 - Winner Area Project Engineer Supervisor Shelley Larson at 605-773-3464 - Senior Region Design Engineer or Vance Martin at 605-845-6947 - Region Design Engineer. SDDOT - Guardrail Repair and/or replacement due to damage on I-90 PID- 090E-391 & 090W-391 This work consists of the Contractor scheduling and conducting a preconstruction meeting prior to beginning work on this contract. Additionally, this work consists of the Contractor providing the Area Engineer a completed list of required submittals.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents