Similar Projects
Two Rivers - Kewaunee Const Ops / Cold10 / HSIP
Infrastructure
Design
$8,000,000 CJ est. value
Manitowoc, WI 54220

Two Rivers - Kewaunee Const Ops / Cold10 / HSIP
Infrastructure
Design
$8,000,000 CJ est. value
Manitowoc, WI 54220

Water Line Replacement
Infrastructure
Bidding
$290,000 CJ est. value
Two Rivers, WI 54241

Water Line Replacement
Infrastructure
Bidding
$290,000 CJ est. value
Two Rivers, WI 54241

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

Mishicot High School - Track and Field Redevelopment
Renovation
Post-Bid
Mishicot, WI 54228

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Howards Grove - Kiel, STH 32/57 South Junction
Infrastructure
Results
$75,000 est. value
WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Repair SSG Andrew Miller ARC Manitowoc, WI
Addition, Demolition, Infrastructure, Renovation - 17,578 SF
Pending Verification
$9,379,249 CJ est. value
Manitowoc, WI 54220

Repair SSG Andrew Miller ARC Manitowoc, WI
Addition, Demolition, Infrastructure, Renovation - 17,578 SF
Pending Verification
$9,379,249 CJ est. value
Manitowoc, WI 54220

Forest Avenue Apartments
New Construction, Infrastructure - 61,206 SF
Design
$17,000,000 CJ est. value
Two Rivers, WI 54241

2023 Hingiss Park Pedestrian Bridge Structure Construction
Demolition, New Construction, Infrastructure
Bidding
$900,000 CJ est. value
Kiel, WI 53042

Concrete Paving Program
Infrastructure
Post-Bid
Manitowoc, WI

Last Updated 03/09/2023 04:07 PM
Project Title

River Point Development Phase 2

Physical Address View project details and contacts
City, State (County) Manitowoc, WI 54220   (Manitowoc County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Work included in this Contract shall be in accordance with the plans, City of Manitowoc Standard Specifications for Public Works Construction, current edition, Standard Specifications for Sewer and Water Construction in Wisconsin, current edition, the State of Wisconsin, Department of Transportation, Standard Specifications for Highway and Structure Construction, current edition, Manitowoc Public Utilities Specifications for Watermain Construction (Appendix E), the provisions of instructions to Bidders and the following Special Provisions, and to the satisfaction of the Engineer. This Contract consists of the new construction of "River Point Phase 2" which includes the area south of River Point Drive, and an extension of River Point Drive and Buffalo. The construction work includes furnishing and installing sanitary sewers, storm sewers, watermain, building services (laterals), furnishing and installing fill or borrow material, grading, graveling, doweled concrete pavement with integral curb, a concrete driveway, concrete curbs, concrete sidewalks, pavement markings, a GreenBlue Stormwater System, asphalt trails, retaining walls, stairs, electrical, streetscape, waterfront improvements, a dock with pilings, dry-stacked stone block features, landscaping, lawn seeding, railings, floating islands, and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract. Add alternates have been identified for additional dockage, floating islands, electrical work, and all other incidentals required to complete the work. Items included in the add alternate have been called out accordingly on the plans. The Contractor shall furnish all of the necessary labor, materials, equipment, and supplies for completing all work included in this contract. A Bid Bond or Surety 2000 in the amount of 5% of the bid must accompany each proposal as a guaranty.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents