Similar Projects
Last Updated | 11/03/2021 02:54 AM |
Project Title | College Walkway Improvements - Phase II |
Physical Address | View project details and contacts |
City, State (County) | Lake City, FL (Columbia County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Sidewalks/Parking Lot |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Consists of but is not limited to the replacement of 678 linear feet of the existing 24’-0” asphalt walkway segment running North-South from the South end of Building 004 to the South end of Building 014. The new walkway will consist of an 18’-0” wide concrete walkway with paver hardscaping. The project will also include a roundabout at the intersection of SE Foundation Place and SE Trustee Terrace to have an enclosed landscaping area with an FDOT Standard Index 520-001 Type RA Curb with an internal radius of 8’ to the front of the curb and paver driving surface with an external radius of 30’ to the outer edge of brick paver |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |