Similar Projects
6th Avenue and 28th Street Pulverizing & Relay, Limestone Base Replacement
Post-Bid
$64,000 est. value
Camp Douglas, WI 54618

2020 Freedom Road Paving
Post-Bid
North Freedom, WI 53951

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Street Resurfacing - Walnut Road And Lakeshore Way
Results
Twin Lakes, WI 53181

Resurface & Expand Privately Owned Vehicle Parking - General
Results
$340,000 est. value
Eau Claire, WI 54702

Concrete Alley Pavement
New Construction
Results
Milwaukee, WI 53202

Paving Work
New Construction
Results
Milwaukee, WI 53202

Bioswale
New Construction
Results
Milwaukee, WI

2020 Asphalt Pavement Repair
Results
Less than $69,000 est. value
Cedarburg, WI 53012

Stewart Avenue Resurfacing
Results
Wausau, WI 54403

Wisconsin Street Reconditioning
Results
New Lisbon, WI 53950

Road Repairs - Entrance Lot C to Sunset Campgrounds
Results
Less than $461,000 est. value
Kansasville, WI 53139

2020 Concrete Pavement Maintenance and Repairs
Results
Less than $78,000 est. value
Milton, WI 53563

CTH 'G' Street Construction
Results
Egg Harbor, WI 54209

Last Updated 07/06/2021 03:44 PM
Project Title

2021 Street and Utility Reconstruction

Physical Address View project details and contacts
City, State (County) Coon Valley, WI 54623   (Vernon County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

2021 Street and Utility Reconstruction to include: street and underground utilities of approximately 5,550 LF of streets including portions of Viking St., Court St., Cardinal St., Roosevelt St., Rose St., Lien St., Fairbanks St., School St., and Anderson St. including excavation, grading, base course, sanitary sewer, storm sewer, water main, curb and gutter, asphalt paving, restoration of the work area, and other miscellaneous items in conformance with the Contract Documents.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents