Similar Projects
Last Updated | 05/31/2022 04:35 AM |
Project Title | Bell Avenue Complete Street Rehabilitation Project |
Physical Address | View project details and contacts |
City, State (County) | State-Wide: CA |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $4,163,870 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project consists of work along Bell Avenue, from West of Bollenbacher Avenue to Astoria Street. This project provides for, in general, widening the roadway, micro-surfacing, constructing median islands, curb, gutter, and sidewalk, curb ramps, installing new drain inlets, leads and maintenance holes, extending storm drainage system approximately 320 linear feet, adjusting water meters and valves to grade, street lighting, sidewalk and barrier replacement at bridge over Magpie Creek, traffic signals, re-striping, roadside signs |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |