Similar Projects
Flex Space Building
New Construction - 30,000 SF
Conception
Summerville, SC 29483

Jedburg Tradeport
New Construction
Conception
$418,000,000 est. value
Summerville, SC 29483

Interfor Sawmill Continuous Kiln
Addition
Design
$30,000,000 est. value
Summerville, SC 29483

Downtown Nexton Mixed-Use
New Construction, Infrastructure - 310,000 SF
Design
$100,000,000 CJ est. value
Summerville, SC 29483

Mass Grading for Parcel 18 of Winding Woods Commerce Park
Infrastructure
Bidding
$800,000 CJ est. value
Saint George, SC 29477

Mass Grading for Parcel 18 of Winding Woods Commerce Park
Infrastructure
Bidding
$800,000 CJ est. value
Saint George, SC 29477

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Environmental Services
Term Contract
Post-Bid
Less than $500,000 est. value
Washington, DC

North Hickory Street Sidewalk Installation
Infrastructure
Results
Summerville, SC 29483

Ridgeville Industrial Campus, Container Yard and Access Road-Phase 2
Infrastructure
Results
Ridgeville, SC

Limehouse Drive/Multi-Residential
New Construction, Infrastructure
Pending Verification
$18,000,000 CJ est. value
Summerville, SC 29485

Salisbury at North Maple - Phase 1
New Construction, Infrastructure - 5,000 SF
Pending Verification
$140,000,000 CJ est. value
Summerville, SC 29483

Intersection Improvement US 176 (State Rd)/S-135 (Mudville Rd)
Infrastructure
Conception
$2,100,000 CJ est. value
Ridgeville, SC 29472

SafeNest Storage
New Construction, Infrastructure - 113,400 SF
Design
$12,200,000 CJ est. value
Summerville, SC 29483

North Maple Street Extension Project
Infrastructure
Bidding
$2,500,000 CJ est. value
Summerville, SC 29483

Last Updated 10/07/2022 12:05 PM
Project Title

Dorchester Commerce Center Bldg 2

Physical Address View project details and contacts
City, State (County) Summerville, SC 29483   (Dorchester County)
Category(s) Heavy and Highway, Industrial/Manufacturing, Single Trades
Sub-Category(s) Environmental, Industrial Warehouse, Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $57,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 2022, permits are under review with the Dorchester County Building department. Information regarding architect has yet to be confirmed. Contractor has yet to be determined. Although a firm timeline has yet to be announced, construction is estimated to begin fourth quarter 2022. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

533,280 SF.
Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Windows.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Fire Protection Specialties.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents