Similar Projects
Asphaltic Concrete Overlay
Infrastructure
Post-Bid
Ruston, LA

Dr 4263 Pw 910 Paved Roads - Task Order No. 4
Infrastructure
Results
$4,500,000 est. value

2021 Capital Improvement Plan, Asphalt Concrete Overlays
Infrastructure
Post-Bid
Ruston, LA

Henry Road Safety Widening: LA 73 To Tillotson and Aikens Road Clearing and Grubbing
Infrastructure, Alteration
Post-Bid
$350,000 to $500,000 est. value

Rehabilitation of several existing roads in Washington Parish
Infrastructure
Post-Bid

2022 District 12, 13, 14 Road Improvements
Infrastructure
Results
$1,366,416 est. value

2022 District 7, 9 Road Improvements
Infrastructure
Results
$1,797,697 est. value

LA 151: I-20 Overpass Deck Replacement
Infrastructure
Bidding
$2,500,000 CJ est. value
Dubach, LA 71235

LA 151: I-20 Overpass Deck Replacement
Infrastructure
Bidding
$2,500,000 CJ est. value
Dubach, LA 71235

LA 146 Bridges Near Kelleys
New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Ruston, LA 71270

LA 146 Bridges Near Kelleys
New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Ruston, LA 71270

US 80: Lt Turn Ln at Nutmeg, LA 818 N and S
Infrastructure
Design
$2,500,000 CJ est. value
Ruston, LA 71270

US 80: Lt Turn Ln at Nutmeg, LA 818 N and S
Infrastructure
Design
$2,500,000 CJ est. value
Ruston, LA 71270

US 80: Lt Turn Ln at Nutmeg, LA 818 N and S
Infrastructure
Design
$2,500,000 CJ est. value
Ruston, LA 71270

Murphy Oil #5687/7857 / Ruston
Demolition, New Construction, Infrastructure - 2,800 SF
Design
$1,500,000 CJ est. value
Ruston, LA 71270

Last Updated 10/03/2022 01:35 AM
Project Title

Rock Island Greenway-hillcrest Connect

Physical Address View project details and contacts
City, State (County) Dubach, LA 71235   (Lincoln County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected March 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Type Improvement Const. Of 3975' Long By 10' Wide Shared Use Trail Length 0.63 miles Parish : JLincoln Estimated Cost Range $250,000 to $500,000 As of October 03, 2022, the project is in Final Planning status. Anticipated letting date is December 31, 2022. LADOT - Rock Island Greenway-hillcrest Connect. *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents