Similar Projects
Camden Baker Apartments
New Construction - 214,991 SF
Conception
Denver, CO 80223

Evans West
New Construction, Demolition - 715,000 SF
Conception
$160,000,000 est. value
Denver, CO 80204

4055 North Elati Street Mixed Use
New Construction - 67,476 SF
Design
Denver, CO 80110

Watershed
New Construction, Build-Out - 180,000 SF
Design
$72,000,000 est. value
Denver, CO 80216

4228 Kalamath Street
New Construction - 95,500 SF
Sub-Bidding
$5,000,000 to $10,000,000 CJ est. value
Denver, CO 80211

Replacement of Protective Netting at Kennedy Golf Course
Post-Bid
Denver, CO 80014

Weatherization Assistance Program
Renovation, Term Contract
Post-Bid
Denver, CO 80214

DRUM Long Park Project
Results
Less than $75,000 est. value
Denver, CO 80203

Foxhill Park Project
Results
$350,000 to $375,000 est. value

Sheridan Station Mile High Development
New Construction - 138,566 SF
Construction
$10,000,000 est. value
Denver, CO 80214

Denargo Market - Phase III
New Construction
Construction
Denver, CO

The Cameron
New Construction
Pending Verification
Denver, CO

Springs at Pena Station
New Construction
Pending Verification
Denver, CO 80249

2150 South Monaco Parkway Mixed-Use Development
New Construction - 20,000 SF
Conception
Denver, CO

4345 46th Street Apartments
New Construction - 123,880 SF
Design
$10,000,000 CJ est. value
Denver, CO 80212

Reported 01/18/2022 12:58 PM
Project Title

Mercy Housing

Physical Address View project details and contacts
City, State (County) Denver, CO 80220   (Denver County)
Category(s) Education, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Park/Playground, Pre-School/Daycare
Contracting Method
Project Status Permitting
Bids Due View project details and contacts
Estimated Value $21,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

132,700 SF - Apartments/Condominiums, 5 Stories Above Grade, 120,000 SF New Construction, 82 Unit(s), Park/Playground, 7,100 SF New Construction, Pre-School/Daycare, 5,600 SF New Construction, 57 Parking Spaces, 0.82 Acre.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Residential Equipment, Residential Appliances, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Selective Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents