Similar Projects
City Hall Window Replacement
Renovation
Sub-Bidding
$440,000 CJ est. value
Norton Shores, MI 49441

Harbor Springs High School First Floor Painting Project and Harbor Springs High School Locker Removal and Installation Project
Alteration
Post-Bid
Harbor Springs, MI

Doorwall Replacement Project
Alteration
Post-Bid
Redford, MI 48239

Annual Overhead Doors Inspections And Repairs
Results
Detroit, MI

Gus Harrison Correctional Facility Security Gate and Controls Repair Replacement
Results
Adrian, MI 49221

Glen Oaks Windows
Alteration
Post-Bid
Farmington Hills, MI 48334

Garage Door Replacement
Alteration
Results
Eastpointe, MI 48021

Security Window Film
Alteration
Post-Bid
Caledonia, MI

Entry Door and Frame, Furnish and Install
Alteration
Results
Grand Rapids, MI

Woodside Elementary Window Replacement
Alteration
Post-Bid
Holland, MI 49424

CDBG Window Replacement
Alteration
Results
Taylor, MI 48180

WCCCD Curtis L. Ivery Downtown Campus Interior/Exterior Door Replacement Project
Alteration
Post-Bid
Detroit, MI

Commercial Construction Services: Correctional Door Replacement B3 D2 D3
Alteration
Results
Grand Rapids, MI 49503

Eureka and Riley Elementary Schools Window Replacement
Alteration
Post-Bid
Dewitt, Saint Johns, MI 48820

Window Replacement and Installation
Alteration
Results
Sanford, MI 48657

Last Updated 03/14/2023 05:36 PM
Project Title

Mendon Community Schools Door Access Control 2023

Physical Address View project details and contacts
City, State (County) Mendon, MI 49072   (Saint Joseph County)
Category(s) Single Trades
Sub-Category(s) Windows/Doors
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Each bid shall be accompanied by good and sufficient bid security or bid bond in an amount not less than 5% of the Bid amount and shall secure the Owner from loss or damage by reason of the withdrawal of the Bid by a Bidder or by failure of the successful Bidder to enter into a Contract with the Owner if his Bid is accepted by the Owner. Approved vendors shall provide, install, configure and warranty door access control hardware systems at multiple locations at the Jr / Sr High School, Elementary School, and Elementary Gym buildings. The following list of main items of the installation and service shall not be considered all inclusive. Mendon Community Schools hereby solicits proposals from qualified vendors for installation of a Door Access Control System. The design and implementation shall meet or exceed all industry best practices, MEN standards, and all State of Michigan policies. QUESTIONS: Please submit ALL questions via email to rfp-response@mendonschools.org DOCUMENT NUMBER: 2023-MEN-DAC-RFP

Details

Division 08 - Openings, Doors and Frames, Windows.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents