Reported | 06/03/2022 12:00 AM |
Project Title | Music Wing Increment 1 and Site Improvements 2 - Modernization - Nevada Union High School |
Physical Address | View project details and contacts |
City, State (County) | Grass Valley, CA 95945 (Nevada County) |
Category(s) | Education, Heavy and Highway |
Sub-Category(s) | Middle/Senior High School, Site Development |
Contracting Method | Competitive Bids. |
Project Status | Accepting Qualifications, Construction Start Expected July 2022 |
Bids Due | View project details and contacts |
Estimated Value | $4,000,000 [brand] Estimate |
Plans Available from | Construction Manager |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | In compliance with the requirements of the California Public Contract Code, the following list of trade contract scopes of work must follow the statutory requirements for the receipt of contractor proposals: Bid Package #008 Selective Demolition, Site Demolition, Site & Building Concrete, Site Clearing, Site Masonry, Earthwork, & Utilities Bid Package #026 Metal Fabrications Bid Package #036 Rough Carpentry & Wood Framing, Drywall, Cement Plastering, Doors, Frames, & Hardware, Painting, Acoustical Ceilings & Wall Treatments, Resilient Flooring, Thermal and Sound Insulation, Casework & Finished Carpentry, & Building Specialties Bid Package #058 Glass & Glazing Bid Package #100 HVAC & Building Controls, & Plumbing Systems Bid Package #103 Electrical & Low Voltage System.Document - Increment #2 04 Supplemental Documents 01 Standard Contract Agreement 01a Attachment B 01b Assignment and Assumption of Contract 02 Standard Insurance Requirements 03 Textura Enrollment Information 04 Preliminary Construction Schedule 05 Logistics Plan 06 Standard Change Order Form 07 Drug Free Workplace Cert 08 Alcoholic Beverage and Tobacco Free Campus Policy 09 Non-Collusion Declaration 010 Hazardous Material Survey Report 05 Clarification & Addenda Addendum #01 - This will be sent at a later date.This project is described as a modernization of Building L Music Wing. Work includes removal of concrete tiered seating decks, new interior partitions, replacement of HVAC system, new lighting and all new interior finishes. Associated sitework includes new concrete stairs, ramps and walkways with updated utilities. |
||||||||||||||||||||||||||||||||||||||||
Details | Middle/Senior High School, Renovation.
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |