Similar Projects
Edgewood85
New Construction - 4,114,800 SF
Conception
$10,000,000 CJ est. value
Bessemer City, NC 28016

Oaks Commerce
New Construction - 470,000 SF
Conception
$10,000,000 CJ est. value
Belmont, NC 28012

New Hope Road Retail
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Gastonia, NC 28052

Amazon Delivery Station - Project GT / Bessemer City
New Construction, Infrastructure - 180,000 SF
Design
$33,000,000 CJ est. value
Bessemer City, NC 28016

RFP Engineering - Landscape Architecture Master Plan
Infrastructure
Bidding
$4,000,000 CJ est. value
Dallas, NC 28034

Mount Holly Carwash / Mount Holly
New Construction, Infrastructure - 4,828 SF
Bidding
$2,000,000 CJ est. value
Mount Holly, NC 28120

ITS and Signals
Infrastructure
Sub-Bidding
$500,000 CJ est. value
Gastonia, NC 28052

Project Stingray
New Construction - 665,722 SF
Post-Bid
$43,300,000 est. value
Gastonia, NC 28052

East Franklin Boulevard / Gaston Mall Drive Median Improvements
Infrastructure
Results
$101,225 CJ est. value
Gastonia, NC 28054

Sandy Ford Road Water Line Loop
Infrastructure
Results
$273,870 CJ est. value
Mount Holly, NC 28120

Woodlawn Industrial Park
New Construction - 607,000 SF
Construction
$10,000,000 CJ est. value
Belmont, NC 28012

TKC Double Oak Spec Building
New Construction - 143,000 SF
Construction
$10,000,000 CJ est. value
Belmont, NC 28012

Fairhaven Place
New Construction, Infrastructure
Pending Verification
$75,000,000 CJ est. value
Gastonia, NC 28054

Friday Park Road Industrial Building
New Construction, Infrastructure - 301,320 SF
Pending Verification
$162,000,000 CJ est. value
Dallas, NC 28034

Rhyne Terraces
New Construction, Infrastructure
Conception
$30,000,000 CJ est. value
Gastonia, NC 28052

Last Updated 08/11/2022 03:35 PM
Project Title

Lithium Processing Facility

Physical Address View project details and contacts
City, State (County) Gastonia, NC 28052   (Gaston County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Site Development
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $500,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a lithium mine site and processing facility. As of August 11, 2022 this project is in the early planning stages and is pending rezoning and special use permit approvals from Gaston County. A mining permit application has been submitted and is pending approval from the North Carolina Department of Environmental Quality's Division of Energy. Information regarding the selection of an architect and general contractor has not been provided. A firm construction timeline has not been provided.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Windows.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Fire Protection Specialties.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents