Similar Projects
Propane/Air Backup Fuel System Components Replacement
Design
$250,000 to $500,000 est. value
Waseca, MN 56093

625 Mechanical and Electrical Infrastructure Upgrades
Alteration
Bidding
$12,500,000 est. value
Minneapolis, MN 55415

625 Mechanical and Electrical Infrastructure Upgrades
Alteration
Bidding
$12,500,000 est. value
Minneapolis, MN 55415

OWEF - Boilers Comprehensive Ultrasonic Thickness Testing
Term Contract
Post-Bid
Rochester, MN 55904

Nicollet Public Schools Mechanical Equipment - Supply
Post-Bid
Mankato, MN

Steam Boiler Replacement at MCF Red Wing
Results
Less than $1,963,759 est. value
Red Wing, MN 55066

JFK Elementary School 2021 Mechanical Upgrades
Results
Lakeville, MN 55044

Replace QR 2 Expansion Joints and Baghouse 2 Expansion Joints
Alteration
Bidding
Rochester, MN 55906

Chiller Maintenance
Post-Bid
Minneapolis, MN

2021 Mechanical Upgrades
Results
Lakeville, MN 55044

Boiler Maintenance Services
Alteration
Bidding
Minneapolis, MN

MnDOT HRTC Mech Sys Maint, Test, Repairs
Term Contract
Post-Bid
Shoreview, MN 55126

Owatonna 2021 Multi-site Mechanical Upgrades
Results
$900,000 est. value
Owatonna, MN 55060

Boiler Repair Services
Post-Bid
Saint Paul, MN 55106

Valley View Elementary School Boiler Plant
Results
Columbia Heights, MN 55421

Last Updated 05/28/2021 08:51 AM
Project Title

Domestic Hot Water Rebalancing Project at Minneapolis Veterans Home

Physical Address View project details and contacts
City, State (County) Minneapolis, MN 55417   (Hennepin County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all labor, tools, and equipment to rebalance the domestic hot water distribution system for the Minneapolis Veterans Home located at 5101 Minnehaha Avenue South, Minneapolis, MN 55417. The Contractor is required to calculate and balance each valve at each location rather than take readings from "representative" locations.There are approximately 72 mixing valves in the building ranging from ceiling valves to individual resident room valves at sinks and showers. The facility can supply drawings, past design,and repairs. Upon completion the building’s water hot temperatures must range between 105-115 degrees F.

Details

Division 22 - Plumbing, Electric Domestic Water Heaters.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents