Similar Projects
Maintenance, Repair, and Replacement of Irrigation Booster Pumps and Related Component
Alteration
Bidding
CA

Well and Lift Station Maintenance, District 02
Infrastructure
Bidding

8-Inch and 12-Inch Ductile Iron Water Main Replacement
Infrastructure
Post-Bid
$7,500,000 to $9,000,000 est. value
San Francisco, CA

Valve Inspection Maintenance and Repair Services
Term Contract, Alteration
Post-Bid
Santa Clara, CA

Renovation of the Existing Underground Steam Distribution System
Infrastructure
Results
$13,222,600 est. value
Yountville, CA 94599

Grayson Well 69 (Replacing Well 274)
Infrastructure
Results
$2,449,000 est. value
Grayson, Modesto, CA 95363

Better Market Street - Phase 1
Infrastructure
Bidding
$29,500,000 est. value
San Francisco, CA 94158

Southern Pump Station Project
Infrastructure
Post-Bid
$6,200,000 est. value
El Centro, CA 92244

Hydronic Valve Replacement
Infrastructure
Results
Channel Islands Beach, CA

38--Folsom Dam Backup Emergency Pump, Motor and Coupler
Term Contract
Bidding
Folsom, CA

Groundwater Treatment Plant Design-Build (Phase B)
New Construction, Infrastructure
Post-Bid
Anaheim, CA

Treated Water Booster Pumps
Alteration
Results
CA

River Trunk Realignment Shackelford Pump Station
Infrastructure
Bidding
$8,000,670 est. value
Modesto, CA

Drilling and Construction of Well 32 and 33 Project
Infrastructure
Post-Bid
Colton, San Bernardino, CA 92324

Groundwater Flush to Waste Project
Infrastructure
Results
Sacramento, CA 95838

Last Updated 11/12/2021 06:54 AM
Project Title

Camino Intertie Pressure Reducing Station

Physical Address View project details and contacts
City, State (County) Placerville, CA   (El Dorado County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $650,000 to $700,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consists of installing two new sleeve valves in an existing vault, one new pump, and associated flow meters at Reservoir. Bidding Documents contain the full description of the Work.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents