Similar Projects
Potawatomi Tower Revitalization
Infrastructure
Conception
$1,000,000 CJ est. value
Sturgeon Bay, WI 54235

Potawatomi Tower Revitalization
Infrastructure
Conception
$1,000,000 CJ est. value
Sturgeon Bay, WI 54235

Egg Harbor Road Rental Townhomes / Cherry Tree Terrace & Apple Tree Terrace
New Construction, Infrastructure
Design
$23,000,000 CJ est. value
Sturgeon Bay, WI 54235

Walk, Bike and Eggsplore Egg Harbor Const / Misc Ped / Bike Trail
Infrastructure
Design
$3,000,000 CJ est. value
Egg Harbor, WI 54209

2022 Parking Lot Improvements - Sister Bay Campus
Infrastructure
Post-Bid
$120,000 est. value
Sister Bay, WI 54234

Asphalt Replacement Program
Infrastructure
Post-Bid
Sturgeon Bay, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Epoxy Pavement Markings - STH/USH, Locations on STN Per Annual Plan
Infrastructure
Results

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

South Duluth Avenue Apartments
New Construction, Infrastructure - 77,680 SF
Pending Verification
$22,000,000 CJ est. value
Sturgeon Bay, WI 54235

YMCAs Sturgeon Bay Addition
Addition, Demolition, Infrastructure - 16,300 SF
Pending Verification
$4,200,000 CJ est. value
Sturgeon Bay, WI 54235

John Miles Park - Community Center Walking Path
Renovation, Addition
Post-Bid
Sturgeon Bay, WI 54235

STH 42, City of Sturgeon Bay, S. Junction STH 57 - Bayview Bridge
New Construction, Infrastructure
Results
WI

Construct Boat Access Parking Area Rowleys Bay
Infrastructure
Construction
$178,000 CJ est. value
Ellison Bay, WI 54210

Last Updated 05/09/2023 03:03 PM
Project Title

Shoreline Revetment

Physical Address View project details and contacts
City, State (County) Sturgeon Bay, WI 54235   (Door County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $77,700 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the work consists of: constructing a riprap slope to reinforce a portion of an existing stacked stone wall adjacent to the Ice Age Trail in Potawatomi State Park. There will be some clearing, removal, and reuse of existing stone. The adjacent Ice Age Trail will be resurfaced with asphalt pavement, and restoration of the existing turf area.41 A copy of WDNR Permit IP-Lake Shore Erosion Control Docket # IP-NE-2022-15-02957 is provided in the Bid Documents. No in-water work can take place annually between March 15 or ice-out, whichever is earlier and July 1 to protect fish spawning, movement and egg incubation periods. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin prevailing wage laws.1 Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply.2 These changes take effect for projects advertised for bid after September 23, 2017. This change does not3 affect the Federal Davis Bacon Act requirements.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents