Similar Projects
Water Main Replacement
Bidding
Elmwood Park, IL

Singer Avenue Water Main Replacement
Bidding
Less than $615,000 est. value
Lemont, IL

Term Agreement for Water Main Construction - District Two
Term Contract
Post-Bid
Chicago, IL

Water Distribution System Leak Survey
Post-Bid
Oak Park, IL

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Frontage Road Water Main Lining Improvements
Renovation
Results
Northfield, IL 60093

Revise Domestic Water System - Division 01
Bidding
Chicago, IL 60612

Water Supply Leak Detection Survey
Post-Bid
Park Ridge, IL 60068

Term Agreement for Water Main Construction - District Three
Term Contract
Results
Chicago, IL

2021 Water Main Improvements & Street Resurfacing
Bidding
Evanston, IL

Basement Water Main Pipe
Renovation
Post-Bid
Park Forest, IL 60466

Term Agreement for Water Main Construction - District One
Term Contract
Results
Chicago, IL

Emergency Watermain and Sewer Services
Bidding
Park Ridge, IL

On-Call Emergency And Routine Water System Repair Services
Post-Bid
Broadview, Westchester, IL 60155

Water Main Construction - District 4 (Project 20-604)
Term Contract
Results
Chicago, IL

Last Updated 06/23/2020 04:33 PM
Project Title

Water Service Line Replacements

Physical Address View project details and contacts
City, State (County) Oak Park, IL   (Cook County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Village of Oak Park has developed a lead water service line replacement policy that will replace the Village side of a one inch service at no cost to a residential property if the customer replaces their side first. The purpose of the work is to eliminate a lead service, increase size for added demand and/or repair a leaking service line. The improvements under this contract shall include installing a new continuous water service line on the Village side of the water service from the water main to the curb stop. While the majority of the locations will have 1” services, it is anticipated that 1-1/2” and 2” water services will be encountered. All water services shall be new Type-K copper. This work shall include installation of a new corporation stop, curb stop and service box furnished by the Village. The installation of the curb stop will include connecting to the private side of the service line, as provided by the customer’s plumber.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents