Similar Projects
Rock Removal - Boston Harbor Federal Navigation
Post-Bid
$75,000,000 to $150,000,000 est. value
Boston, MA

Detention Pond Dredging
Post-Bid
Less than $80,000 est. value
Greenfield, MA 01301

Muddy River Flood Damage Reduction - Phase 2, Boston and Brookline, Massachusetts
Results
$25,000,000 to $100,000,000 est. value
Boston, Brookline, MA

Muddy River Flood Damage Reduction - Phase 2, Boston and Brookline, Massachusetts
Results
$25,000,000 to $100,000,000 est. value
Boston, Brookline, MA

Maintenance Dredging of The Newburyport Harbor, Massachusetts Federal Navigation Project
Post-Bid
$5,000,000 to $10,000,000 est. value
Newburyport, MA

Plymouth Harbor Dredging
Results
Less than $4,500,000 est. value
Plymouth, MA

Stage Harbor Channel Dredging
Results
Less than $507,500 est. value
Chatham, MA 02633

Wellfleet Harbor Maintenance Dredging
Results
$1,000,000 to $5,000,000 est. value
Wellfleet, MA

Lower Harbor CAD Cell No. 4
Results
Less than $14,500,000 est. value
New Bedford, MA

Boston Harbor Navigation Improvement Project-Phase 3 Rock Removal
Results
$100,000,000 to $250,000,000 est. value
Boston, MA 02128

Butler's Pond Dredging and Storm Water Treatment
Results
Less than $800,000 est. value
Quincy, MA 02169

White Brook and Broad Brook Sediment Basins Maintenance Dredging
Results
Less than $240,000 est. value
Easthampton, MA 01027

2020 Dead Neck Sampson's Island Dredging and Beach Nourishment (Phase 3)
Results
$475,000 est. value
Hyannis, MA 02601

James Thomas Apartments Development Site Improvement Project
Results
Less than $40,000 est. value
Taunton, MA 02780

Little Bay Dredge
Results
Bourne, MA

Reported 10/22/2020 12:00 AM
Project Title

Lake Street Landing Dredge Project

Physical Address View project details and contacts
City, State (County) Tisbury, MA   (Dukes County)
Category(s) Heavy and Highway
Sub-Category(s) Dredging
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

To remove up to 50 yards of sandy material from the wharf area of the Town owned Lake Street Landing to make the area more accessible to both commercial and recreational vessels. The following scope of work is required to achieve this goal: Dredging to take place between pier and dinghy floats in the fall of 2020. Dredge to a depth of 6' at mean low water. - Dredge by mechanical methods up to 50 yards of sandy material from the Lake Street landing basin. - Sand to be transported and placed on the Herring Creek Public Beach. - Dredging must take place during fall of 2020 to coincide with the Lake Tashmoo Entrance Channel that is being dredged so that the sand may be spread by others. - Silt screen to be deployed around digging area.

Details

Division 35 - Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Dredging.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents