Similar Projects
Historic Fort Wayne Roof Project
Infrastructure, Alteration
Bidding
$300,000 est. value
Detroit, MI 48209

Gudith Road Landfill
Infrastructure
Bidding
$300,000 est. value
Woodhaven, MI 48183

Drainage System Cleaning
Infrastructure
Post-Bid
MI

Rehabilitation Of Nw Interceptor - 8 Mile Rd To Tireman
Alteration
Post-Bid
Detroit, MI

DDA Riverfront Property: Design-Build Seawall Reconstruction
Results
Detroit, MI 48226

Corrugated Pipe
Results
Detroit, MI

2022 Local Streets and Utilities Replacement
Infrastructure
Post-Bid
Northville, MI

Cherry Hill Over Lower Rouge River Culvert Reconstruction
Term Contract
Results
Detroit, MI

Drainage Structure Adjustments on Belle Isle
Infrastructure
Post-Bid
Detroit, MI

2021 Spring GCCS Construction-LP/Tetratech
Results
Riverview, MI

2022 Louis Savage Garfield Park Drainage and Street Improvements Project
Infrastructure
Post-Bid
$600,000 est. value
Wayne, MI 48184

Conner Creek Canal Dike Improvements
Results
Detroit, MI

Corrugated End Sections
Results
Detroit, MI

Jaycee Park Drainage Improvement Project
Infrastructure
Results
Westland, MI 48185

Northgate Park Drainage Improvement Project
Infrastructure
Results
Westland, MI 48186

Reported 06/04/2022 12:00 AM
Project Title

East Avon Road Early Works - 96-inch Water Transmission Main Relocation: 01.TC.001

Physical Address View project details and contacts
City, State (County) Detroit, MI 48223   (Wayne County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work for the East Avon Road Early Works package generally includes the installation of approx. 1/2 mile of new 96" WTM along East Avon Road and Dequindre Road and includes phased construction of pipe crossing under the Clinton River. The East Avon Road Early Works package also includes the removal and replacement of Mill Race Culvert, reconstruction of East Avon Road, and installation of a new roundabout intersection at East Avon Road and 23 Mile Road.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents