Similar Projects
2021 Roadway Resurfacing Projects
Bidding
Milton, VT

Governor Peck Road and Barber Farm Road Improvements
Bidding
$350,000 est. value
Jericho, VT 05495

Colchester Avenue Sidepath Construction
Post-Bid
$250,000 to $500,000 est. value
Burlington, VT

CY 20 Street Reconstruction Program
Post-Bid
$1,300,000 to $1,500,000 est. value
Burlington, VT 05401

Poker Hill Road Improvements – Segment C and D
Results
$380,320 est. value
Underhill, VT 05489

Spring 2020 Roadway Resurfacing
Results
Less than $300,000 est. value
Milton, VT

Town and Village 2021 Combined Paving Program
Term Contract
Bidding
Essex, VT

MRGP Improvements - Coon Hill Road and Galvin Hill Road
Post-Bid
Colchester, VT

VT 127 (Blakely Road)/Laker Lane Intersection
Results
Colchester, VT 05446

Retainer Contracts for Asphalt Paving, Sealing & Striping Services Statewide
Term Contract
Post-Bid

Hinesburg HES 021-1(19)
Term Contract
Results
$2,500,000 to $5,000,000 est. value
Hinesburg, VT 05461

Roadway Paving Projects Summer 2020
Results
Essex, VT 05452

Browns Trace Road Improvements
Results
Jericho, VT 05465

Lamoille Street Waterline and Roadway Improvements
Results
$560,000 est. value
Essex Junction, VT 05452

Hickok Street Sewer, Stormwater and Roadway Improvements
Results
$1,700,000 est. value
Winooski, VT

Reported 04/01/2021 12:00 AM
Project Title

North Avenue Raised Intersection

Physical Address View project details and contacts
City, State (County) Burlington, VT 05401   (Chittenden County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value Less than $250,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project is located at the intersection of North Avenue, Washington Street, and Berry Street in Burlington, VT. The scope of the work consists of removing and replacing sidewalks, removing and replacing curb, installing new catch basins and pipes, installing new subbase and pavement for a raised intersection, installing pavement markings and signage, reestablishing turf, and other incidentals. Work shall not begin prior to April 15, 2021.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents