Similar Projects
Main Street Mixed-Use Development
New Construction, Infrastructure - 36,000 SF
Design
$10,000,000 CJ est. value
Madison, MS 39110

Main Street Mixed-Use Development
New Construction, Infrastructure - 36,000 SF
Design
$10,000,000 CJ est. value
Madison, MS 39110

RFQ - Developer Selection for University of Mississippi Medical Center (UMMC) Colony Park
New Construction, Infrastructure - 67,500 SF
Bidding
$64,500,000 CJ est. value
Ridgeland, MS 39157

New Waterwood Water Well
Infrastructure
Bidding
$200,000 CJ est. value
Ridgeland, MS 39157

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Southwood Drive Drainage Imporvement Project
Infrastructure
Post-Bid
$300,000 CJ est. value
Canton, MS 39046

King Ranch Road Improvements Project
Infrastructure
Results
$650,063 est. value
Canton, MS 39046

Mill and Overlay Approximately 7 Miles on I-55 from approximately 2 Miles North of SR 22 to the Yazoo County Line
Infrastructure
Results
MS

Newmark Healthcare
New Construction, Infrastructure - 99,000 SF
Pending Verification
$30,000,000 CJ est. value
Madison, MS 39110

Madison Medical Office / Madison
New Construction, Infrastructure - 99,000 SF
Design
$30,000,000 CJ est. value
Madison, MS 39110

Wilkinson County Correction Facility
Infrastructure
Bidding
$2,000,000 CJ est. value
Ridgeland, MS 39157

Madison County Shooting Range
Infrastructure
Post-Bid
$50,000 CJ est. value
Flora, MS 39071

Mill and Overlay approximately 1.5 miles on SR 463
Infrastructure
Results
$1,000,000 to $5,000,000 est. value
Madison, MS 39110

Clark Beverage Group Coca-Cola Warehouse/Distribution Center
New Construction, Infrastructure - 400,000 SF
Design
$100,000,000 CJ est. value
Canton, MS 39046

Infield Drainage Improvements for Madison Central and Ridgeland High School Baseball Fields
Infrastructure
Bidding
$340,000 CJ est. value
Madison, MS 39110

Last Updated 06/01/2023 09:54 AM
Project Title

Mill and Overlay and Remove and Replace asphalt on SR 43 at the intersection of SR 16

Physical Address View project details and contacts
City, State (County) Canton, MS 39046   (Madison County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $4,717,426 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Mill & Overlay approximately 11 miles of SR 16 from SR 43 to Farmhaven and Remove & Replace asphalt on SR 43 at the intersection of SR 16, known as Federal Aid Project No. STBG-0024-02(033) / 108681301 and State Project No. MP-5043- 45(011) / 308301301 in Madison County. Value Estimate Range -$5,000,000 - $10,000,000 Project Completion: 156 Working Days For Federal Aid Projects the attention of bidders is directed to the contract provisions governing selection and employment of labor contained in the bid proposal. Minimum wage rates for Federal Aid Projects have been predetermined by the Secretary of Labor and are subject to Public Law 87-581, Work Hours Act of 1962, as set forth in the contract provisions. Unless otherwise set out in the bid proposal, all other projects are subject to the predetermined minimum wage rate set by the U.S. Department of Labor under the Fair Labor Standards Act. The Mississippi Department of Transportation hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, sex, religion or national origin in consideration for an award. When a DBE goal is contained in the contract, the award will be contingent upon the Contractor satisfying the DBE requirements. Bid bond, signed or countersigned by a Mississippi Resident Agent or qualified non-resident agent, with Power of Attorney attached or on file with the Contract Administration Engineer of the Department, a Cashier's Check or Certified Check for five (5%) percent of bid, payable to State of Mississippi, must accompany each proposal. MSDOT - 03 - Mill and Overlay and Remove and Replace asphalt on SR 43 at the intersection of SR 16 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. SM No. CSTBG0024020331 Due to the COVID-19 pandemic and the Department not allowing visitors in the Administration Building at this time, the DBE Pre-Bid Meeting referenced on Page 5 of Notice to Bidders No. 2611 will be held by video conference only. The meeting will be held at 2:00 P.M. on the day preceding the date of the bid opening using Zoom video conferencing software. Anyone interested in participating can download Zoom and connect to the meeting at the below link. https://zoom.us/j/5548736403 pwd=SDh5S2hQSE5pNG5FOEkzR3NsUnBYQT09 Password (if prompted): 272147 For those unable to participate via Zoom, the below teleconference number may be used instead. 1-888-227-7517 Conference Code: 404496

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents