Similar Projects
Sign Shop Requirements
Infrastructure
Bidding
Toms River, NJ

Guiderail Replacement Central, Contract 2019-1
Infrastructure
Bidding
Less than $5,000,000 est. value
Trenton, NJ

Atlantic City International Airport Amelia Earhart Boulevard Sign Project
Post-Bid
Egg Harbor Township, NJ 08234

Internal and External Signage
Post-Bid
Toms River, NJ

Installation of Hybrid Changeable Message Signs at Various Locations
Results

Installation of Hybrid Changeable Message Signs at Various Locations
Results

Price Sign Footings Replacement & Landscaping At Thirty-Six (36) LNA Service Stations
Term Contract
Bidding

Pedestrian Warning Light Installation on Washington Street/Merritt Lane Intersection
Post-Bid
Rocky Hill, NJ 08553

City Hall Retaining Wall Replacement
Results
Absecon, NJ 08201

Bollard Installation at Briarwood Elementary School and Brooklake Elementary School
Infrastructure
Bidding
Florham Park, NJ 07932

Repair ATONS Hudson River (FY21 CPOP)
Post-Bid
$1,000,000 to $5,000,000 est. value

2020 Striping Program Various Municipalities
Results
Bridgeton, NJ 08302

2022 Speed Hump Project
Infrastructure
Bidding
$200,000 est. value
Bergenfield, NJ

Traffic Striping on Roadways Contract
Term Contract
Post-Bid
Randolph, NJ

Beam Guide Rails and Safety Ends
Term Contract
Results
Randolph, NJ 07869

Last Updated 04/06/2022 04:27 PM
Project Title

Maintenance and Repair of Roadside Safety Features and Sign Structures on the New Jersey Turnpike

Physical Address View project details and contacts
City, State (County) State-Wide: NJ
Category(s) Heavy and Highway
Sub-Category(s) Highway Signs/Guardrails/Barriers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The principal items of work include: Shoulder Closings ............................................................................................................................. 1,250 Each Lane Closings..................................................................................................................................... 50 Each Replace Galvanized Beam Guide Rail ............................................................................................ 125,000 LF Replace/Install Complete Galvanized Steel Tangent Guide Rail Terminal (TGRT) ................ 225 Each Replace 6'-0" Galvanized Guide Rail Post and Blockouts ............................................................ 5,000 Each Ground Mounted Sign ..................................................................................................................... 1,000 Each Timber Post, 6x6 ................................................................................................................................ 1,500 Each

Details

Division 34 - Transportation, Roadway Construction, Vehicle Barriers, Vehicle Guide Rails.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents