Similar Projects
Paving Facilities to Serve Churchill Pod 3 Phase 1
Infrastructure
Bidding
$840,000 est. value
TX

SH 78 - Hazard Elimination and Safety
Infrastructure
Bidding
$1,120,668 est. value
Blue Ridge, TX 75424

Paving Improvements for Inspiration, Phase 8A
Post-Bid
TX

Phase 4A/4C - Bridgewater Paving Package
Post-Bid
TX

Trinity Falls Planning Unit 7 South Paving and Utilities Package #1
Results
McKinney, TX

Systemwide Pavement Profiling
Term Contract
Results
$2,126,250 est. value
Plano, TX 75093

SH 205 - GR, PVMT, STR, SIGNS
Infrastructure
Bidding
$28,357,498 est. value
Lavon, TX 75166

Paving Improvements to Serve Elevon, Phase 1A and 1B
Post-Bid
Lavon, TX

Foster Crossing Roadway Improvements in Front of Pecan Grove Phase 2-4 Subdivision
Results
Less than $695,000 est. value
Anna, TX 75094

FM 2514 - Reconstruct 2 Lane Rural to 4 Lane Divided
Infrastructure
Bidding
$41,824,494 est. value
Parker, TX 75002

Travis Ranch Phase 2K Paving Improvements
Post-Bid
Dallas, TX

Restore Exsisting Pavem't add Shoulders
Results
Less than $7,714,498 est. value
TX

FM 1378 - Rehabilitate Existing Roadway
Infrastructure
Bidding
$5,236,362 est. value
Allen, TX 75013

PGBT Shoulder Repair at Eastbound Alma Road Exit
Infrastructure
Post-Bid
Plano, TX 75086

Construction, Road: County Road 317 (Orr Road) from Stacy Road to South NTMWD Drive
Results
$2,090,000 est. value
McKinney, TX 75069

Last Updated 06/14/2022 02:58 PM
Project Title

19 Trail Repair - City of Plano

Physical Address View project details and contacts
City, State (County) Plano, TX   (Collin County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected September 2022
Bids Due View project details and contacts
Estimated Value $3,190,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Plano Trail System has 85 miles of trail. Of these, 24.66 miles (29%) are 30 years and older, 14.64 (17%) miles are 20-30 years old, and the remaining 45.82 miles (54%) are under 19 years old. The life span of concrete trail is approximately 35 years. Repairs to the trails at Chisholm Trail north and the north side of Hoblitzelle Park. Repairs to the trails on the north and south sides of Bob Woodruff Park, Chisholm Trail North and the north side of Hoblitzelle Park. As of June 13, 2022, this project is included in the City of Plano FY 2020-2024 CIP. Bidding for designers, contractors and a firm timeline has not been established. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents