Similar Projects
Westerra Homes Phases C & D
Infrastructure
Conception
Sequim, WA 98382

RFQ Design - Architectural/Engineering Services for Public Works Office and Shops Building Project
New Construction, Demolition, Infrastructure
Conception
Spokane, WA

Navigation Channel Maintenance Dredging
Infrastructure
Design
$10,000,000 CJ est. value
Clarkston, WA 99403

US 730/5.2 Miles N of Oregon Border - Rockfall Prevention
Alteration
Design
$1,063,000 est. value
Benton City, WA

Stehekin Fire Fighting Facilities Development Project
New Construction, Infrastructure - 6,724 SF
Bidding
$10,000,000 CJ est. value
Stehekin, WA 98852

Stehekin Fire Fighting Facilities Development Project
New Construction, Infrastructure - 6,724 SF
Bidding
$10,000,000 CJ est. value
Stehekin, WA 98852

Oil Water Separators Maintenance Contract
Infrastructure
Post-Bid
Tacoma, WA 98433

RFQ D/B - Construction of ARS/WSU Plant Bioscience Research Building
New Construction, Infrastructure - 113,703 SF
Post-Bid
$89,000,000 CJ est. value
Pullman, WA 99163

Louis Thompson Tightline
New Construction, Infrastructure
Results
$5,800,000 est. value
Sammamish, WA 98074

Lead Service Line Replacement
Alteration
Results
$4,600,000 to $5,800,000 est. value
Auburn, WA 98092

Center for Advanced Materials and Clean Energy Technologies Research Building (CAMCET)
New Construction, Infrastructure - 340,000 SF
Pending Verification
$20,000,000 CJ est. value
Seattle, WA 98164

Shelton Hills Mixed-Use Development
New Construction, Infrastructure - 200,000 SF
Pending Verification
$835,400,000 CJ est. value
Shelton, WA 98584

208th Street East/Mountain Highway Extension - Pierce County
Infrastructure
Conception
$10,598,000 est. value
Spanaway, WA 98387

US 101/Chicken Coop Creek - Remove Fish Barrier
Infrastructure
Design
$2,472,000 CJ est. value
Cosmopolis, WA 98537

John Day Lock and Dam, Navigation Lock, Downstream Gatebearing Shoe Repair, Phase2
Infrastructure
Bidding
$5,000,000 CJ est. value
Goldendale, WA 98620

Last Updated 07/26/2022 05:07 PM
Project Title

Gossom On-site Septic System Installation

Physical Address View project details and contacts
City, State (County) Sedro Woolley, WA 98284   (Skagit County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Indian Health Service - Portland Area Office is issuing Request for Quote (RFQ) 75H70122Q00029 Project Title: Gossom On-site Septic System Installation Location: 22521 Bridgewater Rd., Sedro-Woolley, WA 98284-7854 (Skagit County) This RFQ is being solicited as 100% Small Business Set Aside with preference given to ISBEE firms under NAICS 237110, Water and Sewer Line Related Structures Construction; $39.5M Size Standard. Magnitude of Construction is $25,000 to $100,000 Quotes Due Date: See Block 13 Site Visit: See FAR 52.236-27, Site Visit Construction. SITE VISIT (CONSTRUCTION)(FEB 1995) (a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed. (b) Site visits may be arranged during normal duty hours by contacting the homeowner directly: Angela Gossom Cell: 360-298-4437 Email: agossom@gmail.com Solicitation/Contract Specific Terms & Conditions B.11.1. Bid Bond: A Bid Guarantee IS NOT required. B.11.2. Payment and Performance Bonds ARE NOT required in accordance with FAR 28.102-2. B.11.3. FAR Clause 52.228-13, Alternative Payment Protections IS applicable if the value of the award exceeds $35,000 in accordance with FAR 28.102-3(b). B.11.4. Questions regarding the solicitation and project must be submitted in writing to Toby Hayden, Contracting Officer, via e-mail at toby.hayden@ihs.gov. Questions will be accepted up to 5 days before quote due date. The Government is not obligated to answer any questions submitted after this date. B.11.5. Furthermore, all questions shall be submitted by the prime contractor(s) on behalf of their subcontractor(s) and supplier(s) to the contract Specialist. Questions submitted by subcontractors and/or suppliers directly to the contract specialist will be rejected and not answered. B.11.6. Quote Due Date: Quotes are to be submitted via e-mail to the assigned Contract Specialist/Contracting Officer by the date and time indicated in Block 13 of the SF1442. B.11.7. Quote Acceptance Period: Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected. B.12 Other Important Information: Under no circumstances will any oral statements made be binding upon the Government unless such statements or agreements are issued in writing by the Contracting Officer. Only a warranted Contracting Officer acting within their delegated limits has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the Contracting Officer attempts to make changes to the terms and conditions of this contract, you shall not proceed within the change and shall immediately notify the Contracting Officer. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wells, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents