Similar Projects
Annual Contract for Plumbing/Mechanical Work
Term Contract
Post-Bid
Salt Lake City, UT 84115

DFCM Construction Pre-Qualification (General, Electrical, Mechanical, Roofing, Paving and Civil)
Post-Bid
Less than $3,500,000 est. value
Salt Lake City, UT 84129

J--NIIP B2.9L Unit 4 Motor Rewind and Reconconditioni
Results
Salt Lake City, UT 84044

Salt Lake City (SLC) Cooling Tower Mechanical Separator
Results
$25,000 to $50,000 est. value
Salt Lake City, UT

On-Call Task Order General Mechanical Construction Services
Term Contract
Post-Bid
Salt Lake City, UT 84114

Annual Contract for Boiler Repairs
Term Contract
Results
Salt Lake City, UT 84115

2020 Dive and Splash Pools Boiler Replacement
Post-Bid
Kearns, UT 84118

Construction: Westbrook Elementary, Boiler Replacement
Results
Taylorsville, UT 84129

2020 Replaster of the Outside Dive and Splash Pools
Post-Bid
Kearns, UT 84118

Boiler Replacement
Term Contract
Results
Salt Lake City, UT 84112

DFCM Construction - Pre Qualified Mechanical - DOH USL MOD 1 Autoclave Replacement
Post-Bid
$125,000 est. value
Taylorsville, UT 84129

H344--660 (Con) Engineering- Boiler 3Rd Party Inspection, Start-Up And Testing Services For 660-17-100 New Boiler Installation At The George E Wahlen Va Health Care System In Salt Lake City, Ut
Results
Salt Lake City, UT 84148

Salt Lake County Heat Exchanger Replacement at the Government Center
Results
$65,000 to $75,000 est. value
Salt Lake City, UT 84190

DFCM Construction-Pre Qualified Mechanical-W Jordan Courts Mechanical System and BAS-18251150
Results
Less than $3,000,000 est. value
West Jordan, UT 84088

Holladay Library Boiler Replacement
Results
Holladay, UT 84117

Last Updated 04/13/2021 11:09 AM
Project Title

Bennion Junior High School Boiler Replacement

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84129   (Salt Lake County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of work is to Includes - 1. Furnish all labor, materials, and equipment necessary for the completion of the mechanical and plumbing scope of work. 2. Furnish and install all motors specified in this Division and be responsible for the proper operation of electrical powered equipment furnished by this Division. 3. Furnish exact location of electrical connections and information on motor controls to Division 26. 4. Mechanical Contractor shall obtain the services of independent Test and Balance Agency. 5. Placing the air conditioning, heating, ventilating, and exhaust systems into full operation and continuing their operation during each working day of testing and balancing. 6. Making changes in pulleys, belts, and dampers, or adding dampers, as required for the correct balance as recommended by Balancing Contractor at no additional cost to Owner.7. Air balance, final adjustment and test run. 8. The satisfactory performance of the completed systems is a requirement of this specification.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents