Similar Projects
Houghton Elementary and Chocksett Middle School Hallway Floor Replacement
Alteration
Bidding
$145,000 est. value
Sterling, MA

Houghton Elementary and Chocksett Middle School Hallway Floor Replacement
Alteration
Bidding
$400,000 est. value
Sterling, MA

Carpet Replacement - Frances Perkins Branch Library/EAM
Post-Bid
Worcester, MA 01606

Tile Removal for Degnan Building
Post-Bid
MA

Remove and Replace Rolled Carpet, Cove Base and VCT with Carpet Tile, Cove Base and VCT
Results
Less than $45,000 est. value
Clinton, MA

Mid Rise Hallway Carpet Replacement
Results
$45,000 est. value
Clinton, MA 01510

Carpet Replacement - Lunenburg Public Library
Post-Bid
$55,000 est. value
Lunenburg, MA 01462

High Rise Hallway Carpet Replacement Phase 2
Results
$45,000 est. value
Gardner, MA 01440

Town Hall Flooring Replacement
Term Contract, Alteration
Post-Bid
Oxford, MA

Remove Approximately 7,238 Sq Ft of Floor Tiles
Results
$35,550 est. value
West Boylston, MA

Refinishing of Costello Gym (15,321 Square Feet)
Alteration
Post-Bid
$10,000 to $50,000 est. value
Shrewsbury, MA

Remove and Replace Existing Vinyl Stair Treads
Alteration
Results
$40,926 est. value
North Brookfield, MA 01535

Refinish Gymnasium Floor
Alteration
Post-Bid
$12,000 est. value
Fitchburg, MA

On-Call Flooring Replacement Services
Alteration
Results
$24,900 est. value
Dudley, MA

City Hall New Floor Installations
Alteration
Post-Bid
$20,000 est. value
Leominster, MA 01453

Reported 07/01/2022 12:00 AM
Project Title

A.M. Chaffee Elementary School Carpet Replacement

Physical Address View project details and contacts
City, State (County) Oxford, MA 01540   (Worcester County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $30,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work for the project will consist of, but not be limited to, the following: 1. The work contemplated under this RFQ and described herein is subject to Massachusetts prevailing wage law. Contractors shall make provisions in their quotation to pay their employees prevailing wages as detailed on the accompanying wage schedule in Appendix A. 2. Furnish and install approximately 4,680 square feet of vinyl composite tile. 3. Vinyl composite tile shall be Armstrong imperial texture; approximately 2,340 SqFt "Teal" and 2,340 SqFt "Blue Dreams" or approved equal. 4. Remove and dispose of existing carpet, existing vinyl tile, any/all underlayment material, prepare floors, and install vinyl composite tile and 6" vinyl cove base. 5. Contractor is responsible for properly disposing of the removed carpet and all demo debris in accordance with pertinent Federal, State, and Local regulations. 6. Provide a dumpster on site for all trash and demo debris. 7. Moveable bookshelves, chairs, tables, furniture, personal effects, and computer related items will be moved by Oxford Public Schools staff. 9. Work & demo to be done during normal working hours to the maximum extent feasible. Project must be completed no later than August 19, 2022. 10. A Payment Bond of 50% of your bid price is required.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents