Similar Projects
Bridge Replacement
New Construction
Design
$1,457,585 est. value
Batesville, IN 47006

Bridge Deck Overlay - SR 109
Renovation, Infrastructure
Design
$1,832,454 est. value
Knightstown, IN 46148

Lake Deturk Dam Spillway Improvements Phase I
New Construction
Post-Bid
Martinsville, IN 46151

Goshen Pond Dam Improvements
Renovation
Post-Bid
Goshen, IN

Tunnel T-12 Repairs 2021
Results
Terre Haute, IN

Upper Wildwood Dam Rehabilitation
Renovation
Results
Camby, IN

Bridge Deck Overlay - SR 54
Renovation, Infrastructure
Design
$500,000 est. value
Bloomfield, IN 47424

Dam Removal
Renovation
Post-Bid
Logansport, IN

BL243 Teter Quad Tunnel Waterproofing
Renovation
Results
Bloomington, IN 47406

Bridge Thin Deck Overlay - SR 145
Renovation
Design
Less than $270,000 est. value
French Lick, IN 47432

Weir Dam Removal
Renovation
Post-Bid
Richmond, IN 47374

Cannelton Locks and Dam Floating Mooring Bitt Track Repairs
Renovation
Results
$1,000,000 to $5,000,000 est. value
Cannelton, IN 47520

Hoosier NF GAOA Springs Valley Dam Improvement
Renovation
Post-Bid
$100,000 to $250,000 est. value
Bedford, IN 47421

Tunnel and Tunnel Infrastructure Repairs
Renovation
Results
Less than $2,000,000 est. value
West Lafayette, IN 47907

Tall Oaks Dam Repair and Improvement Project
Infrastructure
Post-Bid
$100,000 CJ est. value
Morgantown, IN 46160

Last Updated 08/31/2022 06:33 AM
Project Title

Intake Screen Replacement

Physical Address View project details and contacts
City, State (County) Bloomington, IN 47401   (Monroe County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $1,554,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes: Installation of two traveling screens, demolition of the existing screens, removal, dewatering and disposal of lake solids from the intake wet well, and all related work, including plumbing, electrical, and associated work. Work by Others: Owner will handle bypass pumping effort around screen during demolition and installation process. The Utility Service Board reserves the right to waive any informality and to accept or reject any or all bids submitted. Bids may be held by the Utility Service Board for a period not-to-exceed sixty (60) days from the date of the opening of Bids for the purpose of reviewing the Bids and investigating the qualifications of the Bidders prior to awarding the contract.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents