Similar Projects
Blair Street, South - 11128 - City of Madison
Infrastructure
Conception
$1,627,000 CJ est. value
Madison, WI 53703

Senior Center Building Improvements - 12434 - City of Madison
Renovation, Infrastructure
Conception
$330,000 CJ est. value
Madison, WI 53703

Diventures / Sun Prairie
New Construction, Infrastructure - 10,500 SF
Design
$2,500,000 CJ est. value
Sun Prairie, WI 53590

Monona Drive Mixed-Use Development
Demolition, New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Madison, WI 53716

Cannonball Path Phase 6
Infrastructure
Bidding
$730,000 CJ est. value
Madison, WI 53711

Olin-Turville Court and East Lakeside Street Resurfacing Water Utilities
Infrastructure
Bidding
$700,000 CJ est. value
Madison, WI 53715

Phased Modernization of the USGS National Wildlife Health Center in Madison - US Geological Survey (USGS) - Western Ecological Research Center
New Construction, Infrastructure
Post-Bid
$10,000,000 CJ est. value
Madison, WI 53711

Water Meter Replacement Installation Services
Term Contract
Post-Bid
McFarland, WI

Pope Farm Ravine Restoration
Infrastructure
Results
Middleton, WI

Steam Pit 59/10 Area Thermal Utilities Improvements - GPC
Infrastructure
Results
$5,000,000 est. value
Madison, WI 53774

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Oliv Madison
Demolition, New Construction, Infrastructure - 23,229 SF
Pending Verification
$100,000,000 CJ est. value
Madison, WI 53703

University Avenue Duplexes
Demolition, New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Middleton, WI 53562

Park Street, South / Olin To Railroad - 11133 - City of Madison
Infrastructure
Conception
$458,000 CJ est. value
Madison, WI 53715

Last Updated 07/05/2023 11:03 PM
Project Title

Pipe Rehabilitation Work, Pipe Lining, Mechanical Joints

Physical Address View project details and contacts
City, State (County) Madison, WI 53704   (Dane County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $747,566 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Storm Sewer Cleaning various diameters (12" - 72"), 5,208 LF; Storm Sewer Cast In Place Pipe (CIPP) various diameters (12" -30"), 5,027 LF; Storm Sewer Mechanical Joint Seal - 36" Diameter, 15 EA; Storm Sewer Mechanical Joint Seal - 72" Diameter, 11 EA; Reinstating Laterals, 8 EA; Contract Completion Time: June 1, 2023 A bid security in the amount of 5% of the total amount of the bid is required for the contract. Each proposal must be accompanied by a bid bond, certificate of annual bid bond, a certified check, bank's draft, bank's check, or postal money order made payable to the Wisconsin Department of Transportation Secretary for 5% of the total amount bid. The electronic template will allow the following options for meeting the proposal guaranty. E-Verify bid bond (Surety2000 & SurePath), uploading a copy of the bid bond or certificate of annual bid bond, certified check, bank draft, or money order. The qualification statement is a sworn statement and consist of information relating to financial ability, equipment, and experience in the work prescribed in this proposal. The statement shall be in writing on the proper standard form furnished by the department. The department will evaluate the statement and determine acceptability prior to bid acceptance. Failure to establish prequalification as stipulated will result in the bid not being opened and/or rejected. For further information, contact Terry Donovan at 608-273-6380, email terry.donovan@meadhunt.com.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents