Similar Projects
Additions and Renovations to Oklahoma Elementary School - Plumbing Construction
Bidding
$840,000 est. value
DuBois, PA 15801

Ephrata High School Additions and Renovations and Ephrata Middle School Renovations - Plumbing Work
Bidding
Ephrata, PA 17522

Pittsburgh Linden K-5 Toilet Rooms and Miscellaneous Renovations - Plumbing Construction
Post-Bid
Pittsburgh, PA 15208

Early Site Access at Pittsburgh International Airport - Plumbing & Fire Protection
Post-Bid
Pittsburgh, PA 15231

Plumbing Alterations - Tyrone Area School District- Middle School/High School
Results
Tyrone, PA

New Community Center - Plumbing Construction
Results
Hershey, PA 17033

Independence Park Sanitary Sewer Replacement Project - Phase 1
Renovation
Construction
$218,000 est. value
Clinton, PA 15026

Riverside High School & Middle School Alterations - Plumbing Construction
Bidding
Ellwood City, PA 16117

Phase 3 Interior Improvements at Parkway West Career - Plumbing Construction
Post-Bid
Oakdale, PA 15071

Courthouse Pipe Insulation and Remediation
Results
Butler, PA 16003

Moon Golf Club Storage Building - Plumbing Construction
Bidding
Moon Township, PA 15108

Cathedral of Learning Ground Floor Renovation - Plumbing and Fire Protection Construction
Post-Bid
$675,000 to $725,000 est. value
Pittsburgh, PA 15260

Hess Ice Rink Addition and Renovations - Plumbing Construction
Results
New Castle, PA 16105

Additions and Alterations to Fairview High School - Plumbing Construction
Bidding
Fairview, PA 16415

South Hills Village Rail Center Pit Restoration and Parking Garage Restoration - Plumbing Contract
Post-Bid
Less than $1,000,000 est. value
Pittsburgh, PA 15241

Last Updated 02/24/2021 10:02 AM
Project Title

Renovate Boiler Plant - SCI Waymart - Plumbing Construction

Physical Address View project details and contacts
City, State (County) Waymart, PA 18472   (Wayne County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000 to $200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Goals for each Prime Contract is as follows: General Construction – ALL BASE BIDS (#1, #2 & #3) SDB-7%. VBE-3 Construct a new boiler building and install two (2) new 500 HP natural gas fired firetube steam boilers, deaerator, surge tank, chemical feed system, water softener, piping, and associated equipment. Relocate one existing 800 HP natural gas fired firetube steam boiler from existing boiler house to the new building. The Project includes replacing steam and condensate piping, serving K-Block, from the utility tunnel to K-Block. It also includes replacing Building 20 steam and condensate piping from the existing boiler building basement to and including the piping in the existing vault located in the parking lot. Base Bid 2 includes the above plus the replacement of Building 20 steam and condensate piping from the existing vault in the parking lot to Building 20. Base Bid 3 includes the above plus the demolition and removal of a 210-foot tall stack and outdoor breeching from the existing boiler house including sealing the building breeching opening. Base Bid 3 also includes the removal of materials previously encapsulated at the bottom 8 feet of the stack. Demolition and removal of the stack cannot begin until the new boilers and relocated boiler are commissioned and turned over to the Institution.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents