Similar Projects
SR 22 / SR 223 Chambers Rd Intersection - Intersection Safety
Infrastructure
Conception
$735,000 CJ est. value
Toppenish, WA 98948

SR 241 / Allen Rd Intersection - Intersection Safety
Infrastructure
Conception
$677,000 CJ est. value
Sunnyside, WA 98944

Early Learning Center - Heritage University
New Construction, Infrastructure
Design
$3,200,000 CJ est. value
Toppenish, WA 98948

SR 410/Rock Creek Vic - Chronic Environmental Deficiency
Infrastructure
Design
$3,562,000 CJ est. value
Naches, WA 98937

Construction of the Transportation Cooperative
New Construction, Infrastructure
Post-Bid
$7,570,000 CJ est. value
Selah, WA 98942

Dollar General #23747 / Harrah
New Construction, Infrastructure - 12,480 SF
Post-Bid
$2,000,000 CJ est. value
Harrah, WA 98933

Collection System Improvements - Phase 1
Infrastructure
Results
$1,204,118 CJ est. value
Yakima, WA 98901

Collection System Improvements - Phase 1
Infrastructure
Results
$1,204,118 CJ est. value
Terrace Heights, WA 98901

Surf Barreled
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Yakima, WA 98901

Childrens Village Expansion
Addition, Infrastructure, Renovation - 11,000 SF
Pending Verification
$6,400,000 CJ est. value
Yakima, WA 98902

US 12/Walla Walla River Bridge - Bridge Painting
Infrastructure
Conception
$2,365,000 CJ est. value
Wapato, WA 98951

US 12/White Pass Vicinity - Culvert Lining
Infrastructure
Design
$689,000 CJ est. value
Yakima, WA 98901

Y--Fish Screen Replacement - Roza Diversion Dam
Term Contract
Post-Bid
Yakima, WA 98901

Ahtanum Road Improvement Project
Infrastructure
Results
$3,514,062 CJ est. value
Yakima, WA 98903

SR 410/1.0 miles E of Chinook Pass Summit - Culvert Lining
Infrastructure
Conception
$1,436,000 CJ est. value
Naches, WA 98937

Last Updated 11/03/2022 03:35 AM
Project Title

Wapato Headworks Rehabilitation

Physical Address View project details and contacts
City, State (County) Wapato, WA 98951   (Yakima County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This information is provided for the following project: Wapato Headworks Rehabilitation. 1. Funding: An award will be made under this solicitation, as funds are presently available. The Government reserves the right to cancel this solicitation before the closing date. 2. Proposal Acceptance Period/Date: The proposal acceptance period shall extend thirty (30) days past the closing date. 3. Solicitation Deadline: November 1, 2022, at 12:00 P.M. Central Time (CT). 4. Questions and Answers: Questions and answers will be conducted and submitted to acquisitions using the Q&A Log, Attachment 8, in Section J. 5. Pre-site visit questions relating to this solicitation shall be submitted to the following individuals: Contract Specialist (CS), Contracting Officer (CO), and Contracting Officer's Representative (COR) no later than October 3, 2022. 6. The site visit for this project is scheduled for October 4, 2022. If you plan on attending, submit a roster of attending individuals with the following information: Name, Title, Company Representing, Email, Phone Number. 7. Post-site visit questions relating to this solicitation shall be submitted to the following individuals: Contract Specialist (CS), Contracting Officer (CO), and Contracting Officer's Representative (COR) no later than October 18, 2022. 8. Notice to Proceed (NTP): The NTP will be issued within 30 calendar days of contract award. 9. Period of Performance: Three hundred (300) calendar days after issuance of NTP. 10. In accordance with FAR Part 36.204 - Disclosure of the Magnitude of Construction Projects estimated price range is between $1,000,000 and $3,000,000. 11. Points of Contact: Contract Specialist: Gregory Hall, gregory.hall@bia.gov Contracting Officer: William McLaughlin, william.mclaughlin@bia.gov Contracting Officer's Representative: Timothy Sauer, timothy.sauer@bia.gov Delivery: 300 Days After Notice to Proceed 00010 Wapato Headworks Rehabilitation. See list of 1 JB attachments. Product/Service Code: Y1KA Product/Service Description: CONSTRUCTION OF DAMS October 4th, 2022 - all times are local time 8:30 a.m. to 10:00 a.m. Project overview by BIA/DOWL at Legends Casino Hotel (Toppenish, WA) BIA/YN Introduction TERO Introduction Project Overview Fish Salvage Coordination General Q&A 10:00 a.m. to 10:30 a.m. View Owner-procured gate equipment at Yakama Power yard (Toppenish, WA) View Outside Equipment (gate stems and pedestal bases) Inside Equipment (actuators, gear boxes, etc. in crates) 10:30 a.m. to 11:00 a.m. Drive to Wapato Diversion Project Site (north of Wapato, WA) 11:00 a.m. to 1:30 p.m. Wapato Diversion Field Review (Controlled Access) Meet at headworks. View headworks and west branch channel Drive to boat launch via Thorpe Road Drive to east diversion via culvert under I-82 Access from south to the river crossing location *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents