Similar Projects
Water Reclamation Facility Upgrade
Results
Less than $3,860,000 est. value
Hyrum, UT 84319

Construction of the Water Treatment Plant Chain and Flight and Wastewater Treatment Plant Nutrient Upgrades Project
New Construction
Post-Bid
Price, UT

Z--GLCA Hite Marina Water Treatment System
Results
$225,000 to $500,000 est. value
UT 84533

Provo WATRR Center Membrane Procurement
Results
Less than $100,000,000 est. value
Provo, UT

SLCWRF Main Plant PLC Upgrades
Post-Bid
Less than $44,000 est. value
Salt Lake City, UT 84115

Rushton Groundwater Treatment Plant General and Electrical Contractor Prequalification
Post-Bid
West Valley City, UT 84119

Construct the Duchesne Valley Water Treatment Plant (DVWTP) Process Improvement Project
Results
Less than $23,000,000 est. value
Duchesne, UT 84021

Sodium Permanganate System
Post-Bid
Salt Lake City, UT 84104

New Water Reclamation Facility (WRF) Project Liquid Train 1
New Construction
Post-Bid
Salt Lake City, UT

Coalville Water Treatment Plant
Post-Bid
Coalville, UT 84017

Ashley Springs Water Treatment Plant Expansion Project
Renovation
Post-Bid
Vernal, UT

Big Cottonwood Water Treatment Plant Sedimentation Basin Rebuild
Results
$1,940,000 est. value
Salt Lake City, UT 84121

Welby Canal Drum Screen
Results
$50,000 to $60,000 est. value
Bluffdale, UT 84065

Reported 08/05/2021 12:00 AM
Project Title

Greendale Water Treatment Plant Upgrades

Physical Address View project details and contacts
City, State (County) Manila, UT   (Daggett County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

A.This project includes rehabilitating and upgrading an existing water treatment plant. B.Currently, primary power is not available to Shell Falls Wayside due to several faults in the underground primary power line C.The existing plant treats groundwater under the direct influence of surface water (GUDI) from spring sources using a coagulation, flocculation, clarification, filtration and disinfection process. The existing water treatment housing (compartments where the treatment process occurs) will remain D.The work includes removing the majority of the existing components and installing a new automatic control system, sensors, piping, fittings, valves, gauges, backflow preventers, chlorinators, pumps and other appurtenances

Details

Water Treatment Plant, Renovation.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents