Similar Projects
INF - Disinfection improvements NEWRRF
Renovation
Conception
$500,000 CJ est. value
Lincoln, NE 68507

Solids Handling Improvements (NEWRRF) - City of Lincoln
Renovation
Conception
$3,000,000 CJ est. value
Lincoln, NE 68507

Mo River WRRF Roughing Filter Upgrade
Renovation, Infrastructure
Bidding
$3,500,000 CJ est. value
Omaha, NE 68107

Wastewater Treatment Plant Replacement
Renovation
Post-Bid
$28,000,000 est. value
Kearney, NE

Water Treatment Plant
New Construction, Infrastructure
Post-Bid
$6,364,000 CJ est. value
Wakefield, NE 68784

Missouri River - W3/Non-Potable System Upgrade
New Construction
Results
Omaha, NE 68107

Wastewater Treatment Plant Flow Improvements
Renovation, Infrastructure
Results
$7,796,000 CJ est. value
Grand Island, NE 68801

North Platte Beef Processing Plant
New Construction, Infrastructure
Construction
$325,000,000 CJ est. value
North Platte, NE 69101

Water Resource Recovery Facility Improvements - Phase 1
Renovation
Pending Verification
$1,971,616 CJ est. value
Fairbury, NE 68352

Wastewater Treatment Plant Improvements - City of Seward
Renovation
Pending Verification
$3,000,000 CJ est. value
Seward, NE 68434

West Plant Transfer Pump Upgrade - City of Norfolk
Renovation
Conception
$360,240 CJ est. value
Norfolk, NE 68701

Water Pollution Control Plant Improvements
New Construction, Infrastructure
Post-Bid
$6,881,143 CJ est. value
Norfolk, NE 68701

Missouri River Water Resource Recovery Facility (MRWRRF) Flood Protective Measures Par A: Flood Hardening
Demolition, New Construction, Infrastructure
Results
$4,383,500 CJ est. value
Omaha, NE 68107

David City Wastewater Treatment Plant (WWTP)
Renovation, Infrastructure
Pending Verification
$5,000,000 CJ est. value
David City, NE 68632

West Treatment Plant Upgrades - City of Norfolk
Renovation
Conception
$840,000 CJ est. value
Norfolk, NE 68701

Last Updated 03/17/2023 07:39 AM
Project Title

Unit 8 Bottom Ash Submerged Conveyor Modification At The Lon D. Wright Power Plant

Physical Address View project details and contacts
City, State (County) Fremont, NE 68025   (Dodge County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $5,999,754 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

There is no mandatory pre-bid meeting. Each bid shall be accompanied by a certified check, cashier's check, or a bank draft on a solvent Nebraska bank insured by FDIC or a bid bond in the amount not less the five percent (5%) of the bid price. That bid security shall be sealed and addressed to the City Clerk, Fremont, Nebraska and labeled on the "Unit 8 Bottom Ash Submerged Conveyor Modification". Any bids received from contractors not so qualified will be returned unopened. The bid security shall guarantee the bidder's good faith to enter into the contract within sixty (60) days at the bid price if accepted by the City Council. Any proposal received which is not accompanied by a bid security will not be considered. The bid security of the successful bidder will be returned when the contracts have been signed, filed with and approved by the City. The bid security of the unsuccessful bidders will be returned when their bids are rejected. The City of Fremont hereby reserves the right to accept that bid which, in its judgment, will produce the best job of workmanship and material, whether or not it is the lowest bid; and reserves the right to reject any or all bids and to waive any or all informalities of any proposal. The successful bidder will be required to submit an acceptable Affirmative Action Statement and Program to the Office of the Mayor within ten (10) days after the bid has been awarded by the Fremont City Council. Failure to submit an acceptable Affirmative Action Statement and Program within the time allotted shall result in the forfeiture of the bidder's bond. The contractor shall be required to furnish a Performance, Payment and Maintenance Bond in a sum equal to one-hundred percent (100%) of the contract price, for a period of one (1) year past the completion of the project. Before the Final Payment may be made, the contractor shall furnish a written clearance from the Commissioner of Labor of the State of Nebraska, certifying that all payments then due of contributions or interest which may have arisen under the contract have been made by the contractor or his subcontractors to the Unemployment Compensation Fund. The contractor target date for completion of work is no later than October 31, 2025. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. All such notices and questions shall be addressed to: Greg Gesell, P.E. (Project Manager) ggesell@hdrinc.com 402-399-4978 and/or Gary Ogden Gary.ogden@fremontne.gov 402-727-2643 Fremont, NE 68025

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents