Similar Projects
2023 High Street East Improvements
Infrastructure
Bidding
$900,000 CJ est. value
Killdeer, ND 58640

McKenzie County Fairgrounds - Bid Package #2
New Construction, Infrastructure
Post-Bid
Watford City, ND

Bottle Filling Stations
Alteration
Post-Bid
Fargo, ND

Fargo PVC Air Line Replace With Aluminum
Results
West Fargo, ND

Touchless Fixtures and Water Fountains
Results
Belcourt, ND 58316

Altru South Campus Hospital Expansion
New Construction, Renovation - 528,000 SF
Construction
$380,000,000 est. value
Grand Forks, ND 58201

Water Softener Replacement
Infrastructure
Post-Bid
Belcourt, ND

Touchless Plumbing and Installation
Term Contract
Results
Belcourt, ND 58316

Sundre Well F Connection Pipeline and Access Road
Infrastructure, Renovation
Post-Bid
$380,000 CJ est. value
Minot, ND 58701

CRWD - NDSP Pipeline Improvements
Infrastructure
Results
$11,594,000 CJ est. value
Kindred, ND 58051

2023 Sanitary Sewer Rehabilitation - CIPP
Infrastructure
Post-Bid
$375,000 CJ est. value
Minot, ND 58701

2022 Lagoon Repairs
Infrastructure
Results
$338,948 CJ est. value
Surrey, ND 58785

2023 Watermain Replacement on Gateway (Mill Rd - 20th St.)
Infrastructure
Post-Bid
$799,345 CJ est. value
Grand Forks, ND 58203

2022 Fairgrounds Trunk 36-Inch Sewer Repair
Infrastructure
Results
$163,158 CJ est. value
Minot, ND 58701

Sanitary Sewer Improvement District 2022
Infrastructure
Results
$2,664,568 CJ est. value
Ashley, ND 58413

Last Updated 02/02/2023 12:16 PM
Project Title

Lift Station, Force Main, and Wastewater Treatment Lagoon Improvements

Physical Address View project details and contacts
City, State (County) Center, ND 58530   (Oliver County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $3,786,391 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: Constructing new wastewater treatment facility lagoons, new sanitary sewer, force main, lift station, valve vault and miscellaneous other work. Each bid must be accompanied by a separate envelope containing a bidder's bond in a sum equal to 5% of the full amount of the bid executed by the bidder as principal and by a surety, conditioned that if the principal's bid is accepted and a contract is awarded to the principal, the principal, within ten (10) days after the notice of the award, shall execute a contract in accordance with the terms of the bid and the bid bond, and any conditions of the City of Center, as required by law. A countersignature of a bid bond is not required. If the City of Center elects to award a contract to the lowest responsible bidder, and the lowest responsible bidder does not execute a contract within ten (10) days, the bidder's bond will be forfeited to the City of Center, and the City of Center may award the project to the next lowest responsible bidder. Each bidder must possess a valid North Dakota contractor's license for the full amount of their bid, as required by N.D.C.C. 43-07-7. Each bidder MUST enclose a copy of their Contractor's License or Certificate of Renewal, issued by the North Dakota Secretary of State, in their bid bond envelope, and each license must be valid and dated at least 10 days prior to the date set for bid opening, as required under N.D.C.C. 43-07-12. Bidders on this work will be required to comply with Title 40 CFR Part 33- Participation by Disadvantaged Business Enterprises in the United States Environmental Protection Agency Programs. The requirements for bidders and contractors under this regulation concern utilization of Minority Business Enterprises (MBE), Women's Business Enterprises (WBE), and Small Business Enterprises (SBE) and are explained in the specifications. The goal for MBE is 2% of the total dollar value of the project. The goal for WBE is 3% of the total dollar value of the project. To demonstrate a good faith effort to comply, bidders must include the MBE /WBE subcontractor solicitation form in the bid package. Bidders on this work will be required to comply with American Iron and Steel requirements of the Consolidated Appropriations Act, 2014. The requirements for bidders and contractors under this regulation are explained in the specifications. Instructions to Bidders. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. Est. Value: $ 4,000,000.00

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents