Similar Projects
Rosewood Skyscraper
New Construction - 1,700,000 SF
Conception
San Francisco, CA 94158

425 Broadway Mixed-Use Development
New Construction, Infrastructure - 18,735 SF
Design
$23,000,000 CJ est. value
San Francisco, CA 94133

CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

Master As-Needed Agreement M14 Curb Ramp Construction
Infrastructure
Post-Bid
$1,000,000 est. value
San Francisco, CA

Positive Location of Underground Utility Facility (Potholing) Services
Infrastructure
Post-Bid
$1,400,000 est. value

Better Market Street - Phase 1
Infrastructure
Results
$24,000,000 est. value
San Francisco, CA 94158

Better Market Street - Phase 1
Infrastructure
Results
$24,000,000 est. value
San Francisco, CA 94158

Howard Street Mixed-Use
New Construction, Infrastructure - 117,400 SF
Construction
$20,000,000 CJ est. value
San Francisco, CA 94103

Porsche TI / San Francisco
Renovation, Infrastructure - 70,902 SF
Construction
$2,000,000 CJ est. value
San Francisco, CA 94103

One Oak
New Construction, Infrastructure - 370,930 SF
Pending Verification
$120,000,000 CJ est. value
San Francisco, CA 94102

3rd Street Residential Development
New Construction, Infrastructure
Pending Verification
$17,365,000 CJ est. value
San Francisco, CA 94124

California Campus - San Francisco University High School
Demolition, New Construction, Infrastructure - 47,710 SF
Design
$23,500,000 CJ est. value
San Francisco, CA 94115

SFRPD Gene Friend Recreation Center
New Construction, Demolition, Term Contract, Alteration
Post-Bid
$40,000,000 est. value
San Francisco, CA

Sloat Infrastructure Improvements
Infrastructure
Results
$218,000 est. value
San Francisco, CA 94158

India Basin Mixed-Use Development
New Construction, Infrastructure - 1,000,000 SF
Construction
$1,000,000,000 CJ est. value
San Francisco, CA 94124

Last Updated 06/22/2023 06:06 PM
Project Title

Herz Recreation Center

Physical Address View project details and contacts
City, State (County) San Francisco, CA 94134   (San Francisco County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Fitness Center, Misc. Recreational, Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $17,367,200 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Project was awarded to S.J. Amoroso Construction Co., LLC in the amount of $17,548,200 to cover (1) the base bid ($17,367,200), and (2) bid alternates #1-3 ($181,000). work to be done under this contract includes the construction of new recreation center and associated outdoor spaces at Herz Playground, a facility within John McLaren Park. The address of the new facility is 160 Mrs. Ruth Jackson Way (formerly Hahn Street). The recreation center will feature a basketball court, bleachers, multi-purpose room, staff office, reception area, lobby, kitchen, restrooms, storage and custodial spaces. The sitework includes tree removal, demolition, grading, landscaping, new site furnishings and lighting, an adult fitness area, picnic area, nature exploration area and pathways. Additional work includes a staff maintenance yard, utilities, right- of-way work and all other work as shown on the drawings and specifications. Contract duration: 487 consecutive calendar days from NTP to Substantial Completion. The Small Business Enterprise (SBE) subcontracting requirement for this project is 20%. Bidder is required to perform good faith efforts regardless of if the goal is met. Bid discounts per San Francisco Administrative Code Chapter 14B are not applicable to this contract. For details, contact Selormey Dzikunu by phone at (415) 939-9339 or by email at Selormey.Dzikunu@sfdpw.org.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Entrances, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Specialty Flooring, Carpeting, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers.
Division 11 - Equipment, Athletic Equipment, Exercise Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings, Rugs and Mats.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Selective Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents