Similar Projects
Life Science Building
New Construction - 320,000 SF
Design
$10,000,000 CJ est. value
Chicago, IL 60622

New Innovative Center & School Renovations
Renovation
Post-Bid
Carol Stream, IL 60188

FY2021 BPA Contract - APS Site Operations
Post-Bid
Lemont, IL 60439

Oak Park & River Forest HS South Cafeteria Phase I
Renovation
Results
Oak Park, IL 60302

East Building Addition Phase II & Field House Expansion
Renovation, Addition - 119,000 SF
Results
Lincolnshire, IL 60069

Argonne National Laboratory Long Beamline Building Laboratory
New Construction - 23,000 SF
Construction
Lemont, IL 60439

Arie Crown Hebrew Day School
Renovation, Addition - 165,000 SF
Construction
$20,000,000 est. value
Skokie, IL 60076

Thomas Engineering Offices / Manufacturing
Renovation - 48,300 SF
Pending Verification
$1,000,000 est. value
Elgin, IL 60123

Lincoln Yards Life Sciences Building
New Construction - 320,000 SF
Pending Verification
$10,000,000 CJ est. value
Chicago, IL 60642

North High School Master Facility Plan
Post-Bid
Downers Grove, IL 60515

Water Quality Laboratory Renovation
Renovation - 1,370 SF
Results
Evanston, IL 60201

ICR Wendell Phillips Academy HS
Post-Bid
Chicago, IL 60653

McHenry High School West Campus Addition and Renovations
Renovation, Addition - 64,000 SF
Results
Less than $44,000,000 est. value
McHenry, IL 60050

2021 Summer Renovations at West Oak Campus and Diamond Lake School
Renovation
Post-Bid
Mundelein, IL 60060

Orozco School Environmental Abatement
Renovation
Results
Chicago, IL 60608

Last Updated 04/05/2021 05:21 PM
Project Title

Richwoods High School Science Lab Renovation Phase II

Physical Address View project details and contacts
City, State (County) Peoria, IL 61614   (Peoria County)
Category(s) Education, Laboratory
Sub-Category(s) Laboratory, Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes a science lab renovation at Richwoods High School, including associated mechanical, electrical, plumbing and architectural finishes work.

Details

Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Fans, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents