Last Updated | 01/25/2023 08:03 AM |
Project Title | Hurd Creek Hatchery Relocation |
Physical Address | View project details and contacts |
City, State (County) | Sequim, WA 98382 (Clallam County) |
Category(s) | Government/Public, Heavy and Highway |
Sub-Category(s) | Misc. Buildings, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected February 2023 |
Bids Due | View project details and contacts |
Estimated Value | $8,092,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Provide all labor, material, equipment, and permits to demolish the existing hatchery and build a new hatchery with all required infrastructure above the flood plain at the Departments Hurd Creek Hatchery, located at 955 Fasola Road Sequim Washington, Washington, 98382 in Clallam County. Work includes: Demolition of designated structures on the existing hatchery site, relocating designated existing ponds, restoring the existing site; construction of a distribution box, raceways, hatchery building, piping and infrastructure for both new and relocated structures. For information or technical questions regarding this project, email CAMP.Bids@dfw.wa.gov with the project title and project number in subject line. This email may also be used to request copies of the projects posted documents (Drawings, Specifications, Addenda). Minority and Women's Business Enterprises (MWBE) are encouraged to participate in the bidding as prime contractors, subcontractors, or suppliers. THE PROPOSED HATCHERY RELOCATION IS NEEDED TO MOVE HATCHERY OPERATIONAL FACILITIES ABOVE THE FLOODPLAIN. PROJECT AREA: 62,100 SQ. FT. Engineers Estimate: $9,000,000 The Owner will NOT answer questions received after 2:00 p.m. on October 27, 2022. Due to this threat the scope of this project is to move the hatchery above the flood plain. This shall include construction of a new hatchery building, 10x100 raceways, distribution tower, UV system, office building and water re-use systems. This shall also include all infrastructure and site work required to install fiberglass round ponds and raceways. This shall also include the demolition and removal of the existing hatchery infrastructure including the existing hatchery building and pond structures located on the existing hatchery location. No demolition can occur until the new hatchery site is operational. All transfer of water supplies shall be coordinated to keep the existing hatchery functional throughout the transition. The proposed hatchery relocation is needed to move hatchery operational facilities above the floodplain. |
||||||||||||||||||||||||||||||||
Details | 62,100 SF.
|
||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |